![]() |
|
|
| NYC Department of Buildings | ||
| Job Overview | ||
|
|||||
| ARA / LAA Job Overview |
| Page: 1 of 1 | ||
| Premises: 211 BRIGHTON 1 WALK BROOKLYN | BIN: 3244655 Block: 8671 Lot: 56 | |
| FILE DATE | JOB # | JOB TYPE | JOB STATUS | STATUS DATE | LIC # | APPLICANT | ||
| 04/07/2016 | 320799230 | PR | I LAA SIGNED OFF | 08/29/2017 | MP 002233 | THOMPSON | ||
| TO REMOVE OLD GAS BOILER AND REPLACE WITH NEW SLANT/FIN GAS BOILER. REPLAC | ||||||||
|
Work on Floor(s): BAS | ||||||||
| 03/17/2016 | 320797125 | PR | I LAA SIGNED OFF | 08/28/2017 | MP 002233 | THOMPSON | ||
| TO CAP AND REMOVE 2 1/2 BATHROOMS CREATED W/2 WATER CLOSETS, 2 WASH BASINS | ||||||||
|
Work on Floor(s): ATT | ||||||||