| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/10/2018 |
302583513 |
02 |
A2 |
P APPROVED |
09/10/2018 |
|
GIBBONS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHO
|
|
Work on Floor(s): BAS
|
| 07/03/2018 |
302583513 |
01 |
A2 |
R PERMIT-ENTIRE |
07/28/2025 |
0069352 PE |
GIBBONS |
|
NOT APPLICABLE
|
|
INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS, IN CONJUNCTION WIT
|
|
Work on Floor(s): BAS
|
| 05/04/2018 |
302572516 |
02 |
A2 |
P APPROVED |
05/04/2018 |
|
GAFFAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 P.S. 14K REMOVE 9 EXISTING SPRINKLER HEADS
|
|
Work on Floor(s): BAS
|
| 08/04/2017 |
302575176 |
01 |
A2 |
R PERMIT-ENTIRE |
10/22/2018 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
FS/IS14K - FILING ON BEHALF OF CONTRACTOR FOR INSTALLATION OF TEMPORARY OU
|
|
Work on Floor(s): OSP
|
| 08/03/2017 |
302575167 |
01 |
A3 |
X SIGNED OFF |
12/31/2024 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
FN/PS14K - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMP
|
|
Work on Floor(s): OSP
|
| 12/09/2016 |
302573016 |
01 |
A3 |
P APPROVED |
01/30/2020 |
0021711 RA |
RAY |
|
NOT APPLICABLE
|
|
FILING HEREWITH FIRE PROTECTION PLANS .NO CHANGE IN USE, EGRESS OR OCCUPAN
|
|
Work on Floor(s): BAS,ROF 001 thru 003
|
| 09/02/2016 |
302572516 |
01 |
A2 |
R PERMIT-ENTIRE |
07/28/2025 |
0076864 PE |
GAFFAR |
|
NOT APPLICABLE
|
|
P.S. 14K REMOVE 9 EXISTING SPRINKLER HEADS AND ASSOCIATED PIPING IN THE BA
|
|
Work on Floor(s): BAS
|
| 07/19/2016 |
302579751 |
05 |
A2 |
R PERMIT-ENTIRE |
08/11/2017 |
0076864 PE |
GAFFAR |
|
NOT APPLICABLE
|
|
K14- REMOVE EX. BOILERS W/ ASSOCIATED PIPING, INSTALL NEW. PROVIDED NEW HW
|
|
Work on Floor(s): OSP,BAS
|
| 07/19/2016 |
302579751 |
04 |
A2 |
R PERMIT-ENTIRE |
08/11/2017 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
K14- LIGHTING REPLACEMENT FILED HERE WITH AS PER PLAN.
|
|
Work on Floor(s): BAS
|
| 07/19/2016 |
302579751 |
03 |
A2 |
R PERMIT-ENTIRE |
08/11/2017 |
0022723 RA |
RYSZKIEW |
|
NOT APPLICABLE
|
|
K14- TO PROVIDE NEW GAS METER ROOM WITH NEW STAIRS ON BAS. MINOR RENOVATIO
|
|
Work on Floor(s): BAS,ROF
|
| 07/19/2016 |
302579751 |
02 |
A2 |
R PERMIT-ENTIRE |
08/11/2017 |
0069496 PE |
NIZAMBAD |
|
NOT APPLICABLE
|
|
K14 - PROVIDE NEW CONCRETE PAD IN BOILER ROOM TO SUPPORT NEW EQUIPMENT,
|
|
Work on Floor(s): BAS
|
| 07/19/2016 |
302572286 |
01 |
A2 |
R PERMIT-ENTIRE |
10/25/2016 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM.
|
|
Work on Floor(s): BAS
|
| 07/19/2016 |
302579751 |
01 |
A2 |
R PERMIT-ENTIRE |
07/28/2025 |
0091510 PE |
XIAO |
|
NOT APPLICABLE
|
|
K14- REPLACEMENT OF OIL FIRED HEATING PLANT W/ GAS FIRED HEATING PLANT INC
|
|
Work on Floor(s): BAS 001 thru 003
|
| 11/20/2015 |
302577343 |
03 |
A2 |
P APPROVED |
11/20/2015 |
|
MEILAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 09/02/2015 |
302577343 |
02 |
A2 |
P APPROVED |
09/02/2015 |
|
MEILAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED: MODIFICATION TO THE EXISTING FIRE
|
|
Work on Floor(s): 003
|
| 07/20/2015 |
302577343 |
01 |
A2 |
X SIGNED OFF |
04/05/2016 |
0055649 PE |
MEILAN |
|
NOT APPLICABLE
|
|
PROPOSED: MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM. NO CHANGE OF
|
|
Work on Floor(s): 003
|
| 07/10/2015 |
302577316 |
02 |
A2 |
X SIGNED OFF |
04/06/2016 |
0055649 PE |
MEILAN |
|
NOT APPLICABLE
|
|
MH: REMOVE / CAP EXISTING DUCTWORK. PROVIDE NEW DUCTWORK, CONNECT TO EXIST
|
|
Work on Floor(s): 003
|
| 07/10/2015 |
302577316 |
01 |
A2 |
X SIGNED OFF |
04/06/2016 |
0020705 RA |
VUJOSEVI |
|
NOT APPLICABLE
|
|
OT: REMOVE EXISTING CLOSETS AND MILLWORK. PROVIDE NEW PARTITIONS, DOORS, P
|
|
Work on Floor(s): 003
|
| 05/06/2015 |
302562288 |
06 |
A2 |
P APPROVED |
05/06/2015 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 12/05/2014 |
302565132 |
06 |
A2 |
P APPROVED |
12/05/2014 |
|
PATEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GND,1ST,2ND,3RD,ROF
|
| 09/16/2014 |
302562288 |
04 |
A2 |
P APPROVED |
09/16/2014 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 09/16/2014 |
302562288 |
05 |
A2 |
P APPROVED |
09/16/2014 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 04/02/2014 |
302565132 |
05 |
A2 |
P APPROVED |
04/02/2014 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): OSP,1ST,2ND,3RD,ROF
|
| 02/04/2014 |
302569833 |
01 |
A2 |
X SIGNED OFF |
03/18/2015 |
0069054 PE |
CHAN |
|
NOT APPLICABLE
|
|
IS 14K- FILED HEREWITH ENERGY ANALYSIS ASSOCIATED WITH REPLACEMENT OF EXIS
|
|
Work on Floor(s): BAS,ATT 001 thru 003
|
| 01/15/2014 |
302565132 |
04 |
A2 |
P APPROVED |
01/15/2014 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): OSP,1ST,2ND,3RD,ROF
|
| 07/08/2013 |
302566168 |
02 |
A3 |
P APPROVED |
07/08/2013 |
|
STILLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/11/2012 |
302566649 |
01 |
A2 |
X SIGNED OFF |
07/30/2015 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
PS14K: INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINK
|
|
Work on Floor(s): BAS 001 thru 003
|
| 09/26/2012 |
302566168 |
01 |
A3 |
X SIGNED OFF |
07/02/2014 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
IS14K/FN SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPOR
|
|
Work on Floor(s): OSP
|
| 09/26/2012 |
302566177 |
01 |
A3 |
X SIGNED OFF |
04/15/2014 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
IS14K/SF SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPOR
|
|
Work on Floor(s): OSP
|
| 09/18/2012 |
302566122 |
01 |
A3 |
X SIGNED OFF |
06/18/2014 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
IS14K/SH SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPOR
|
|
Work on Floor(s): OSP
|
| 06/04/2012 |
302562288 |
03 |
A2 |
P APPROVED |
06/04/2012 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMOVE TWO EXISTING FLOOR DRAINS IN BOILER
|
|
Work on Floor(s): BAS
|
| 06/04/2012 |
302562288 |
02 |
A2 |
P APPROVED |
06/04/2012 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 04/19/2012 |
302565132 |
03 |
A2 |
X SIGNED OFF |
12/18/2014 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
REPLACE 20 EXISTNG ROOF DRAINS, RELOCATE 16 EXISTING VENTS, AND REFLASH 13
|
|
Work on Floor(s): OSP,1ST,2ND,3RD,ROF
|
| 04/19/2012 |
302565132 |
02 |
A2 |
X SIGNED OFF |
12/18/2014 |
0775871 PE |
KHALID |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW HOLLOW METAL DOORS FOR THE ENTRANCE, GYMNASIUM, GIRLS
|
|
Work on Floor(s): GND,1ST,2ND,3RD,ROF
|
| 04/19/2012 |
302565132 |
01 |
A2 |
X SIGNED OFF |
12/18/2014 |
0073676 PE |
PATEL |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW CHAIN LINK FENCE AROUND,SCHOOL,REPAIRING OF EXISINTG M
|
|
Work on Floor(s): GND,1ST,2ND,3RD,ROF
|
| 10/28/2011 |
302562288 |
01 |
A2 |
X SIGNED OFF |
05/13/2015 |
0086302 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
REMOVE TWO EXISTING FLOOR DRAINS IN BOILER PIT AND ABANDON ASSOCIATED DRAI
|
|
Work on Floor(s): BAS
|
| 05/06/2011 |
302561056 |
01 |
A3 |
X SIGNED OFF |
11/04/2011 |
0064399 PE |
ERFANI |
|
NOT APPLICABLE
|
|
ERECT TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION # 3025
|
|
Work on Floor(s): 001
|
| 12/07/2010 |
302558890 |
02 |
A2 |
X SIGNED OFF |
10/12/2012 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
IS014K: REPLACEMENT OF 7 CATCH BASIN TYPE YARD DRAINS AT SCHOOLYARD AND
|
|
Work on Floor(s): OSP
|
| 12/07/2010 |
302558890 |
01 |
A2 |
X SIGNED OFF |
10/12/2012 |
0068104 PE |
HUSSAIN |
|
NOT APPLICABLE
|
|
IS014K: REMOVE AND REPLACE ASPHALTIC CONCRETE & CONCRETE PAVEMENT. REPLACE
|
|
Work on Floor(s): OSP
|
| 12/30/2003 |
301389085 |
04 |
A2 |
P APPROVED |
12/30/2003 |
0052751 PE |
RANA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): THI,RD
|