| Premises: 1773 EAST 13 STREET BROOKLYN | BIN: 3182902 Block: 6796 Lot: 59 | |
| FILE DATE | JOB # | DOC # | JOB TYPE | JOB STATUS | STATUS DATE | LIC # | APPLICANT | IN AUDIT | ZONING APPROVAL | |
| 07/31/2013 | 340076633 | 01 | A3 | R PERMIT-ENTIRE | 03/06/2015 | 0080350 PE | SOLTANIZ | NOT APPLICABLE | ||
| INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIR AS | ||||||||||
|
Work on Floor(s): OSP | ||||||||||
| 07/19/2013 | 320784870 | 01 | A3 | R PERMIT-ENTIRE | 06/09/2014 | 0084178 PE | ALI | Y | NOT APPLICABLE | |
| REBUILD THE PARAPET WALL AT FRONT ELEVATION (180SQ FT.) AS PER PLAN. NO CH | ||||||||||
|
Work on Floor(s): OSP | ||||||||||