 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/08/2017 |
340460986 |
01 |
A2 |
X SIGNED OFF |
04/04/2017 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
NEW GAS-FIRED BOILER FOR SPACE HEATING AND NEW GAS PIPING FOR RESIDENTIAL
|
|
Work on Floor(s): CEL
|
| 09/24/2016 |
321402451 |
02 |
A2 |
P APPROVED |
02/06/2017 |
|
GUNAL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 08/14/2016 |
340411753 |
01 |
A3 |
R PERMIT-ENTIRE |
08/25/2016 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 06/13/2016 |
321402451 |
01 |
A2 |
R PERMIT-ENTIRE |
06/13/2016 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
INTERIOR REPAIRS, INCLUDING WINDOW REPLACEMENT, BATHROOM FIXTURE ONLY
|