 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/18/2025 |
302376293 |
02 |
A3 |
P APPROVED |
12/19/2025 |
0085541 PE |
SCHNEIDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 12/18/2025 |
310053063 |
02 |
A2 |
P APPROVED |
12/19/2025 |
0085541 PE |
SCHNEIDE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/08/2023 |
322036006 |
02 |
A2 |
P APPROVED |
02/07/2024 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,ROF 001 thru 006
|
| 06/01/2020 |
322036006 |
01 |
A2 |
X SIGNED OFF |
02/20/2024 |
0087790 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): FAC,ROF 001 thru 006
|
| 10/09/2019 |
340700441 |
01 |
A2 |
H P/E IN PROCESS |
10/09/2019 |
0087790 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 12/08/2019 FACADE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP 001 thru 006
|
| 06/05/2019 |
340681088 |
01 |
A2 |
H P/E IN PROCESS |
06/05/2019 |
0087790 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/23/2019 FACADE REPAIRS
|
|
Work on Floor(s): OSP 001 thru 006
|
| 07/20/2017 |
340485022 |
03 |
A2 |
P APPROVED |
07/27/2017 |
|
ARENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/21/2017 |
340515874 |
01 |
A2 |
X SIGNED OFF |
01/10/2018 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
INSTALL CHIMNEY LINER PER PLANS.
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/17/2017 |
340485022 |
02 |
A2 |
P APPROVED |
04/21/2017 |
|
ARENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 03/22/2017 |
340485022 |
01 |
A2 |
X SIGNED OFF |
03/30/2018 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD12959-01) WITH BOILER AND
|
|
Work on Floor(s): CEL
|
| 10/15/2012 |
340022157 |
01 |
A3 |
X SIGNED OFF |
07/02/2013 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT HEAVY DUTY SIDEWALK SHED PER DRAWINGS. INSTALLATION SHALL COMPLY WIT
|
|
Work on Floor(s): OSP
|
| 10/16/2009 |
302382632 |
02 |
A2 |
P APPROVED |
10/23/2009 |
|
Bank |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005,006
|
| 10/24/2007 |
310053063 |
01 |
A2 |
X SIGNED OFF |
12/22/2025 |
0085541 PE |
SCHNEIDE |
|
NOT APPLICABLE
|
|
Replacing existing parapet wall as shown on plan. No change in use, egres
|
|
Work on Floor(s): OSP
|
| 07/17/2007 |
302382632 |
01 |
A2 |
X SIGNED OFF |
11/20/2009 |
0048991 PE |
Bank |
|
NOT APPLICABLE
|
|
THIS ALTERATION IS BEING FILED TO REMOVE DOB VIOLATION # 1003VP (WORK WITH
|
|
Work on Floor(s): 005,006
|
| 07/11/2007 |
302376293 |
01 |
A3 |
X SIGNED OFF |
12/22/2025 |
0085541 PE |
SCHNEIDE |
|
NOT APPLICABLE
|
|
APPLICATION FILE TO REMOVE VIOLATION# 38057870H, 38057871J AND REPAIR BULK
|
|
Work on Floor(s): ROF
|
| 07/03/2007 |
302359891 |
01 |
A3 |
X SIGNED OFF |
12/01/2008 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED A TOTAL OF 180 FT LONG AT 345 86TH STREET
|
|
Work on Floor(s): 001
|