 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/18/2015 |
340261175 |
01 |
A3 |
X SIGNED OFF |
11/09/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF STUCCO AS PER PLAN.NO CHANGE IN USE OCCUPANCY OR EGRESS UN
|
|
Work on Floor(s): 001 thru 006
|
| 04/30/2015 |
340255217 |
01 |
A3 |
X SIGNED OFF |
02/28/2018 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 06/13/2003 |
301558945 |
01 |
A2 |
X SIGNED OFF |
01/17/2006 |
0076805 PE |
CHRYSLER |
|
NOT APPLICABLE
|
|
INSTALL 2000 GALLON #2 OIL TANK IN CELLAR. BUILD 3 HR FR CONCRETE
|
|
Work on Floor(s): CEL
|