| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/16/2017 |
340514456 |
01 |
A2 |
X SIGNED OFF |
10/31/2017 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
BOILER AND BURNER REPLACEMENT FOR USE WITH EXISTING NATURAL GAS AND EXISTI
|
|
Work on Floor(s): CEL
|
| 03/08/2012 |
320446200 |
01 |
A3 |
R PERMIT-ENTIRE |
03/13/2012 |
0085457 PE |
DANCE 11 |
|
NOT APPLICABLE
|
|
PROPOSE TO REPLACE COPING STONE FROM PARAPETT WALL AS PER PLANS.NO CHANGE
|
|
Work on Floor(s): 006
|
| 07/19/2011 |
320335712 |
01 |
A3 |
R PERMIT-ENTIRE |
07/17/2012 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 05/19/1992 |
300172300 |
01 |
A2 |
X SIGNED OFF |
07/22/1992 |
0041242 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
TO CONVERT FROM #6 TO # 2 OIL & NATURAL GAS. NO CHANGE IN USE EGRESS OR
|
|
Work on Floor(s): CEL
|