 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/25/2014 |
340190279 |
01 |
A2 |
X SIGNED OFF |
11/18/2014 |
0068287 PE |
CHAN |
|
NOT APPLICABLE
|
|
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR, APT# 1R. CEILING, FLOORING &
|
|
Work on Floor(s): 001
|
| 01/10/2007 |
302287638 |
01 |
A2 |
X SIGNED OFF |
04/27/2007 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND REINSTALL EXISTING BURNER. NO CHANGE IN USE, EGRESS O
|
|
Work on Floor(s): CEL
|
| 05/11/1998 |
300715331 |
01 |
A2 |
R PERMIT-ENTIRE |
05/27/1998 |
0038313 PE |
CHIARO |
|
NOT APPLICABLE
|
|
OIL FIRED #2 BOILER/BURNER REPL. AND 2 275 GAL.F.O.TANK REPLACEMENTS.
|
|
Work on Floor(s): CEL
|