FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
01/25/2019 |
321805604 |
02 |
A2 |
P APPROVED |
01/29/2019 |
|
MAHANGU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,OSP
|
10/15/2018 |
321805604 |
01 |
A2 |
X SIGNED OFF |
02/07/2019 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF FACIAL STORE ON 1ST FLOOR. REPAIR EXISTING FLOOR,
|
|
Work on Floor(s): 001,OSP
|
05/23/2018 |
321761107 |
01 |
A2 |
X SIGNED OFF |
07/30/2018 |
0098295 PE |
LI |
|
NOT APPLICABLE
|
|
REMOVE EXISTING ILLUMINATED SIGN AND INSTALL NEW AWNING IN THE FRONT AS P
|
|
Work on Floor(s): OSP
|
12/27/2017 |
321404315 |
01 |
A3 |
X SIGNED OFF |
02/21/2018 |
0091510 PE |
XIAO |
|
NOT APPLICABLE
|
|
LEGALIZE THE CONSTRUCTION WORK FOR REPLACING THE ANGLE/LINTEL AND APPROX 4
|
|
Work on Floor(s): 002,003,004
|
08/29/2017 |
321646849 |
01 |
A2 |
R PERMIT-ENTIRE |
08/29/2017 |
0091827 PE |
REVANS |
|
NOT APPLICABLE
|
|
REPLACE (1) NEW LOW PRESSURE STEAM BOILER FILED IN CONJUNCTION WITH LAA#
|
|
Work on Floor(s): CEL
|
08/11/1998 |
300781170 |
01 |
A2 |
R PERMIT-ENTIRE |
08/12/1998 |
0045488 PE |
GRYNBAL |
|
NOT APPLICABLE
|
|
CONVERSION FROM OIL TO GAS: REPLACE OIL FIRED BOILER AND BURNER WITH A N
|
|
Work on Floor(s): CEL
|