 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/21/2019 |
340662660 |
01 |
A2 |
X SIGNED OFF |
05/22/2020 |
0035645 RA |
TEETER |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR INTERIOR RENOVATION AS PER DRAWINGS SUBMITTED. THIS
|
|
Work on Floor(s): 007
|
| 07/10/2008 |
310278240 |
01 |
A3 |
R PERMIT-ENTIRE |
03/16/2009 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
ERECT PIPE SCAFFOLD AS PER PLAN AT 222 EAST 8 STREET. DURING REMEDIAL REPA
|
|
Work on Floor(s): 001
|
| 07/12/2007 |
302361138 |
01 |
A2 |
X SIGNED OFF |
07/21/2008 |
0016482 RA |
Pulaski |
|
NOT APPLICABLE
|
|
Propose to combine two (2) apartments at 2nd floor; construct interior
|
|
Work on Floor(s): 002
|
| 06/22/2007 |
302368505 |
01 |
A3 |
R PERMIT-ENTIRE |
03/08/2010 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED 108 FT LONG AT 222 EAST 8TH STREET. DURIN
|
|
Work on Floor(s): 001
|
| 09/14/2006 |
302222191 |
01 |
A2 |
X SIGNED OFF |
03/08/2007 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
BOILER, BURNER AND OIL TANK REPLACEMENTAND VONVERSION TO #2 OIL AND NAT
|
|
Work on Floor(s): CEL
|