 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/14/2018 |
321834823 |
01 |
A2 |
R PERMIT-ENTIRE |
05/07/2019 |
0033885 RA |
CHANG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION ON EXIST APT #1B, PARTITION AND PLUMBING WORK AS PER P
|
|
Work on Floor(s): 001
|
| 02/02/2018 |
321783888 |
01 |
A1 |
J P/E DISAPPROVED |
10/05/2018 |
0086687 PE |
KUZMIN |
|
PENDING
|
|
PROPOSED 5TH FLOOR AND PENTHOUSE ON AN EXISTING 4 STORY BUILDING.
|
|
Work on Floor(s): CEL 001 thru 005
|
| 11/25/2015 |
321277765 |
01 |
A2 |
R PERMIT-ENTIRE |
02/11/2016 |
0060930 PE |
SALAMON |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT 1A
|
|
Work on Floor(s): 001
|
| 06/30/2006 |
302185962 |
01 |
A2 |
R PERMIT-ENTIRE |
02/20/2007 |
0073350 PE |
Levin |
|
NOT APPLICABLE
|
|
Application filed to add on "Fuel Burning" work type in conjunction with
|
|
Work on Floor(s): CEL
|
| 04/27/2004 |
301745690 |
01 |
A2 |
R PERMIT-ENTIRE |
09/12/2014 |
0073350 PE |
LEVIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF DUAL FUEL BOILER INTO EX ISTING BOILER RM NO CHANGE IN
|
|
Work on Floor(s): CEL
|
| 06/18/1999 |
300831303 |
03 |
A1 |
P APPROVED |
07/13/1999 |
0065639 PE |
KRUPNIK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/08/1999 |
300831303 |
02 |
A1 |
G PAA FEE DUE |
06/08/1999 |
0065639 PE |
KRUPNIK |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/23/1999
|
|
Work on Floor(s): CEL
|
| 01/28/1999 |
300831303 |
01 |
A1 |
X SIGNED OFF |
09/15/1999 |
0065639 PE |
KRUPNIK |
|
NOT APPLICABLE
|
|
NEW SUPERS APARTMENT IN CELLAR,PLUMBING AND PARTITION WORK AS PLAN
|
|
Work on Floor(s): CEL
|