| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/19/2022 |
340592004 |
02 |
A3 |
P APPROVED |
01/22/2022 |
|
ONYEAGOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/08/2021 |
321193258 |
13 |
NB |
P APPROVED |
11/22/2021 |
|
TAM |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF,BAS 001 thru 007
|
| 07/09/2021 |
321193258 |
12 |
NB |
P APPROVED |
07/13/2021 |
0093795 PE |
XIA |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 05/25/2021 |
321193258 |
11 |
NB |
P APPROVED |
06/02/2021 |
0093795 PE |
XIA |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 05/05/2021 |
321193258 |
10 |
NB |
P APPROVED |
05/10/2021 |
|
TAM |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF,BAS 001 thru 007
|
| 04/15/2021 |
321193258 |
09 |
NB |
P APPROVED |
06/02/2021 |
0093795 PE |
XIA |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 04/15/2021 |
321193258 |
08 |
NB |
P APPROVED |
05/21/2021 |
0093795 PE |
XIA |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 12/03/2020 |
322091419 |
01 |
SC |
U COMPLETED |
12/08/2020 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
CONDOMINIUM SUBDIVISION OF B:5101 L:26 INTO 130 CONDO TAX LOTS: COMMMUNITY
|
|
Work on Floor(s): CEL,BAS 001 thru 008
|
| 09/01/2020 |
321193258 |
07 |
NB |
P APPROVED |
02/17/2021 |
|
TAM |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF,BAS,PEN 001 thru 007
|
| 12/20/2019 |
322019800 |
01 |
A2 |
R PERMIT-ENTIRE |
11/06/2020 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/05/2021 THIS APPLICATION IS FILED FO A TEMPORARY USE PERM
|
|
Work on Floor(s): BAS,OSP
|
| 10/10/2019 |
340700496 |
01 |
A3 |
X SIGNED OFF |
04/08/2021 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER ACCESS DURIN
|
|
Work on Floor(s): OSP
|
| 05/22/2019 |
321952106 |
01 |
A2 |
X SIGNED OFF |
04/29/2021 |
0084996 PE |
CHEN |
|
NOT APPLICABLE
|
|
AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM WITH POST F
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 008
|
| 05/22/2019 |
321952115 |
01 |
A2 |
X SIGNED OFF |
04/29/2021 |
0084996 PE |
CHEN |
|
NOT APPLICABLE
|
|
MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION AND SPINKLER FIRE ALARM SYSTEM W
|
|
Work on Floor(s): CEL,BAS,001
|
| 05/03/2019 |
321193258 |
06 |
NB |
P APPROVED |
05/09/2019 |
|
TAM |
|
GRANTED 01/25/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF,BAS 001 thru 008
|
| 06/20/2018 |
321604144 |
02 |
A2 |
P APPROVED |
07/25/2018 |
|
LIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 002
|
| 06/20/2018 |
321586663 |
02 |
A2 |
P APPROVED |
07/25/2018 |
|
LIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 002
|
| 06/13/2018 |
321724372 |
01 |
A2 |
X SIGNED OFF |
05/25/2021 |
0093795 PE |
XIA |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY STANDPIPE WITH AN AIR PRESSURIZED ALARM PER BC
|
|
Work on Floor(s): CEL,ROF,OSP,BAS 001 thru 008
|
| 04/02/2018 |
340592004 |
01 |
A3 |
X SIGNED OFF |
01/25/2022 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS.AND SHALL COMPLY WITH CHA
|
|
Work on Floor(s): OSP
|
| 03/20/2018 |
340591522 |
01 |
A3 |
H P/E IN PROCESS |
03/20/2018 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/20/2018 INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 01/04/2018 |
340561582 |
01 |
A3 |
X SIGNED OFF |
09/27/2021 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
SUBMIT BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING APPLICATION
|
|
Work on Floor(s): OSP
|
| 12/29/2017 |
321193258 |
05 |
NB |
X SIGNED OFF |
02/09/2022 |
0093795 PE |
XIA |
|
GRANTED 01/25/2018
|
|
INSTALL SPRINKLER SYSTEM, STANDPIPE SYSTEM AND SERVICE CONNECTION TO WATER
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 12/29/2017 |
321193258 |
04 |
NB |
X SIGNED OFF |
02/09/2022 |
0093795 PE |
XIA |
|
GRANTED 01/25/2018
|
|
INSTALL MECHANICAL SYSTEM & PLUMBING AS PER PLAN. THIS APPLICATION IS FILE
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 12/26/2017 |
321193258 |
03 |
NB |
X SIGNED OFF |
02/09/2022 |
0093697 PE |
LIN |
|
GRANTED 01/25/2018
|
|
SUBMIT SOE WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION # 321193258.
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 12/26/2017 |
321193258 |
02 |
NB |
X SIGNED OFF |
02/09/2022 |
0093697 PE |
LIN |
|
GRANTED 01/25/2018
|
|
SUBMIT STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION #32119
|
|
Work on Floor(s): CEL,BAS,ROF,OSP 001 thru 008
|
| 08/16/2017 |
340531099 |
01 |
A3 |
X SIGNED OFF |
04/20/2021 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED TEMPORARY CONSTRUCTION FENCE.
|
|
Work on Floor(s): OSP
|
| 06/14/2017 |
321604144 |
01 |
A2 |
X SIGNED OFF |
07/27/2018 |
0093697 PE |
LIN |
|
NOT APPLICABLE
|
|
PARTIAL DEMO OF EXISTING STEEL FRAME FILED UNDER PREVIOUS NB APPLICATION
|
|
Work on Floor(s): BAS 001 thru 002
|
| 06/01/2017 |
321586663 |
01 |
A2 |
X SIGNED OFF |
07/27/2018 |
0093697 PE |
LIN |
|
NOT APPLICABLE
|
|
PARTIAL DEMO OF EXISTING STEEL FRAME FILED UNDER PREVIOUS NB APPLICATION
|
|
Work on Floor(s): BAS 001 thru 002
|
| 05/18/2017 |
321193258 |
01 |
NB |
X SIGNED OFF |
02/09/2022 |
0018525 RA |
TAM |
|
GRANTED 01/25/2018
|
|
PROPOSED (9) STORIES NEW RESIDENTIAL AND COMMUNITY FACILITIES BUILDING WIT
|
|
Work on Floor(s): CEL,OSP,ROF,BAS 001 thru 007
|
| 08/06/2007 |
301174495 |
05 |
NB |
P APPROVED |
08/27/2007 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/15/2021
|
|
Work on Floor(s): CEL 001 thru 004
|
| 01/31/2007 |
302286862 |
01 |
PA |
P APPROVED |
05/25/2007 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/11/2020 PRACTICAL LEARNING CENTER
|
|
Work on Floor(s): CEL
|
| 11/21/2006 |
301174495 |
04 |
NB |
P APPROVED |
12/08/2006 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/15/2021
|
|
Work on Floor(s): CEL 001 thru 004
|
| 03/29/2006 |
301174495 |
03 |
NB |
P APPROVED |
03/27/2007 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/15/2021
|
|
Work on Floor(s): CEL 001 thru 004
|
| 09/09/2005 |
301174495 |
02 |
NB |
P APPROVED |
09/15/2005 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/15/2021
|
|
Work on Floor(s): CEL 001 thru 004
|
| 11/01/2004 |
301856276 |
01 |
A2 |
J P/E DISAPPROVED |
11/04/2004 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 INSTALLATION OF FIRE ALARM SYSTEM FILED IN CONJUNC
|
|
Work on Floor(s): CEL,004
|
| 11/01/2004 |
301856267 |
01 |
A2 |
R PERMIT-ENTIRE |
04/07/2006 |
0022175 RA |
GERDES |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/23/2021 INSTALLATION OF SPRINKLER SYSTEM IN NEW BUILDING,
|
|
Work on Floor(s): 004
|
| 10/12/2004 |
301834781 |
01 |
DM |
X SIGNED OFF |
01/06/2005 |
OT |
Han |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 09/03/2004 |
301756188 |
01 |
DM |
X SIGNED OFF |
01/06/2005 |
|
HAN |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,001,002,ATT
|
| 09/03/2004 |
301756179 |
01 |
DM |
X SIGNED OFF |
01/06/2005 |
|
HAN |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,001,002,ATT
|
| 08/23/2004 |
301604342 |
01 |
A3 |
R PERMIT-ENTIRE |
08/31/2004 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/23/2021 INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 100' D
|
|
Work on Floor(s): 001
|
| 08/06/2004 |
301820901 |
01 |
A3 |
R PERMIT-ENTIRE |
09/13/2004 |
0022175 RA |
Gerdes |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/25/2021 CC worktype filed in conjunction with NB #3011744
|
|
Work on Floor(s): OSP
|