 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/13/2018 |
321527371 |
03 |
A2 |
P APPROVED |
07/19/2018 |
|
WOELFLIN |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 09/18/2017 |
321527371 |
02 |
A2 |
P APPROVED |
09/28/2017 |
|
WOELFLIN |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 03/13/2017 |
321527362 |
01 |
A2 |
X SIGNED OFF |
12/14/2018 |
0029069 RA |
WOELFLIN |
|
NOT APPLICABLE
|
|
BOILER IN CONJUNCTION WITH ALT 2 RENOVATION
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 03/13/2017 |
321527371 |
01 |
A2 |
X SIGNED OFF |
08/18/2021 |
0029069 RA |
WOELFLIN |
|
PENDING
|
|
RENOVATION OF EXISTING BUILDING WITH NEW STOREFRONT AND ROOF REPLACEMENT.
|
|
Work on Floor(s): CEL,ROF 001 thru 003
|
| 12/11/2015 |
321206967 |
01 |
A2 |
X SIGNED OFF |
11/29/2016 |
0029069 RA |
WOELFLIN |
|
NOT APPLICABLE
|
|
INTERIOR NON STRUCTURAL DEMO APPLICATION
|
|
Work on Floor(s): CEL 001 thru 003
|