FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
05/14/2015 |
340258884 |
01 |
A2 |
X SIGNED OFF |
11/10/2016 |
0026250 RA |
ALWARI |
|
NOT APPLICABLE
|
|
THE WORK SHALL INCLUDE INSTALLATION OF NON-LOAD BEARING PARTITIONS AT CELL
|
|
Work on Floor(s): CEL,ROO
|
04/21/2015 |
320287872 |
03 |
PA |
P APPROVED |
05/07/2015 |
|
COOK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
03/12/2015 |
320287872 |
02 |
PA |
P APPROVED |
03/13/2015 |
0185961 RA |
COOK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
01/13/2012 |
320039285 |
06 |
NB |
P APPROVED |
01/26/2012 |
|
COOK |
|
GRANTED 04/30/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
01/09/2012 |
320419347 |
01 |
A3 |
X SIGNED OFF |
11/14/2013 |
0018596 RA |
COOK |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN FILED IN CONJUNCTION WITH NB 320039285
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
10/14/2011 |
320039285 |
05 |
NB |
P APPROVED |
11/01/2011 |
0045101 PE |
COPELAND |
|
GRANTED 04/30/2010
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): UDG,CEL,ROF 001 thru 005
|
10/04/2011 |
320370889 |
01 |
A2 |
X SIGNED OFF |
05/14/2013 |
0067443 PE |
LUCKNER |
|
NOT APPLICABLE
|
|
INSTALLATION OF 6.9 KW SOLAR ELECTRIC SYSTEM CONSISTING OF 30 (230 WATT) S
|
|
Work on Floor(s): ROF
|
04/29/2011 |
320301936 |
01 |
A2 |
X SIGNED OFF |
01/23/2014 |
0059461 PE |
GALLI |
|
NOT APPLICABLE
|
|
HEREWITH FILED INSTALLATION OF YARD/AREA DRAINS, STORM DRAINAGE PIPING AND
|
|
Work on Floor(s): OSP
|
04/13/2011 |
320287872 |
01 |
PA |
U COMPLETED |
11/16/2012 |
0185961 RA |
COOK |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL
|
02/04/2011 |
320269286 |
01 |
A3 |
X SIGNED OFF |
09/02/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS AT 39 HEGEMAN AVENUE. DURING NE
|
|
Work on Floor(s): OSP
|
01/20/2011 |
320265397 |
01 |
A2 |
X SIGNED OFF |
05/04/2012 |
0059212 PE |
SCHMIDT |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER SYSTEM IN 5 STORY BUILDING FILED IN CONJUNCTION
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
12/09/2010 |
320039285 |
04 |
NB |
P APPROVED |
05/31/2011 |
0045101 PE |
COPELAND |
|
GRANTED 04/30/2010
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): UDG,CEL,ROF 001 thru 005
|
11/05/2010 |
320235697 |
01 |
A3 |
X SIGNED OFF |
03/25/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION,
|
|
Work on Floor(s): OSP
|
07/06/2010 |
320166592 |
02 |
A3 |
P APPROVED |
07/08/2010 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
07/06/2010 |
320163416 |
02 |
A3 |
P APPROVED |
07/08/2010 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
05/25/2010 |
320166592 |
01 |
A3 |
X SIGNED OFF |
12/29/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A 5FT PLYWOOD FENCE ON TOP OF 150 LINEAR FEET OF JERSEY BA
|
|
Work on Floor(s): OSP
|
05/24/2010 |
320163416 |
01 |
A3 |
X SIGNED OFF |
12/29/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A 155 FT LONG, 8 FT HIGH SIDEWALK SHED. SIDEWALK SHED SHAL
|
|
Work on Floor(s): OSP
|
05/18/2010 |
320165799 |
01 |
A3 |
X SIGNED OFF |
11/25/2011 |
0060595 PE |
BENNETT |
|
NOT APPLICABLE
|
|
SHORING PLANS FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #32003928
|
|
Work on Floor(s): OSP
|
05/17/2010 |
320147658 |
02 |
A3 |
P APPROVED |
11/29/2011 |
|
COOK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 BPP FILED FOR A TOTAL OF 382.81 LINEAR OF F
|
|
Work on Floor(s): OSP
|
04/13/2010 |
320147658 |
01 |
A3 |
X SIGNED OFF |
07/30/2014 |
0018596 RA |
COOK |
|
NOT APPLICABLE
|
|
BPP FILED FOR A TOTAL OF 382.81 LINEAR OF FEET STREET FRONTAGE IN CONJUNCT
|
|
Work on Floor(s): OSP
|
06/26/2009 |
320039285 |
01 |
NB |
X SIGNED OFF |
08/04/2014 |
0185961 RA |
COOK |
|
GRANTED 04/30/2010
|
|
NEW BUILDING
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/26/2009 |
320039301 |
01 |
A2 |
J P/E DISAPPROVED |
07/08/2009 |
0045101 PE |
COPELAND |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 INSTALLATION OF SPRINKLER SYSTEM AND STANDIPE SYST
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/26/2009 |
320039294 |
01 |
A2 |
X SIGNED OFF |
05/04/2012 |
0045101 PE |
COPELAND |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CARBON MONOXIDE AND SPRINKLER FIRE
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/26/2009 |
320039285 |
03 |
NB |
X SIGNED OFF |
08/04/2014 |
0069933 PE |
MURRAY |
|
GRANTED 04/30/2010
|
|
STRUCTURAL WORK FOR NEW BUILDING
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/26/2009 |
320039285 |
02 |
NB |
X SIGNED OFF |
08/04/2014 |
0045101 PE |
COPELAND |
|
GRANTED 04/30/2010
|
|
MECHANICAL, PLUMBING AND BOILER WORK FOR NEW BUILDING
|
|
Work on Floor(s): UDG,CEL,ROF 001 thru 005
|