| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/24/2017 |
321567880 |
02 |
A2 |
P APPROVED |
05/25/2017 |
|
LANGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERSION OF GAS TO GAS BOILER AND INSTALL
|
|
Work on Floor(s): CEL
|
| 05/03/2017 |
321567880 |
01 |
A2 |
R PERMIT-ENTIRE |
12/11/2017 |
0044575 PE |
LANGER |
|
NOT APPLICABLE
|
|
CONVERSION OF GAS TO GAS BOILER AND INSTALLATION OF NEW HOT WATER HEATER A
|
|
Work on Floor(s): CEL
|
| 04/26/2016 |
321374419 |
01 |
A2 |
X SIGNED OFF |
02/08/2017 |
0078495 PE |
MAK |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE APT# 1F ON 1ST, 2F ON 2ND AND 3F ON 3RD F
|
|
Work on Floor(s): 1ST,2ND,3RD
|