FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
03/20/2023 |
322159123 |
02 |
A1 |
P APPROVED |
03/24/2023 |
|
WAINER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP 001 thru 006
|
01/24/2023 |
322159123 |
01 |
A1 |
R PERMIT-ENTIRE |
02/24/2023 |
0023225 RA |
WAINER |
|
NOT APPLICABLE
|
|
THIS ALT 1 NO WORK APPLICATION IS TO CORRECT THE LOT# ON THE PREVIOUS
|
|
Work on Floor(s): CEL,OSP 001 thru 006
|
05/31/2013 |
340066476 |
01 |
A2 |
X SIGNED OFF |
05/18/2018 |
0071073 PE |
SIEGEL |
|
NOT APPLICABLE
|
|
EXTERIOR MASONRY REPAIR WORK AT THE 5TH & 6TH FLOORS AS PER PLANS FILED.
|
|
Work on Floor(s): 005 thru 006
|
05/17/2013 |
320767247 |
01 |
A3 |
X SIGNED OFF |
08/21/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
10/14/2010 |
320226732 |
01 |
A2 |
J P/E DISAPPROVED |
10/18/2010 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNI
|
|
Work on Floor(s): CEL
|
10/08/2010 |
320225564 |
01 |
A2 |
J P/E DISAPPROVED |
10/13/2010 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS
|
|
Work on Floor(s): CEL
|
|
320225573 |
01 |
A2 |
A PRE-FILED |
10/05/2010 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
INSTALL NEW MECHANICAL DUCTWORK ALONG WITH A/C UNIT. INSTALL NEW PLUMBING
|
|
Work on Floor(s): CEL
|
09/07/2010 |
320195034 |
01 |
A1 |
J P/E DISAPPROVED |
01/25/2011 |
0014995 RA |
MAMMINA |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 PARTIAL CONVERSION CELLAR TO U.G. 4 G PHILANTHROPI
|
|
Work on Floor(s): CEL
|
07/14/2010 |
320180406 |
01 |
A2 |
P APPROVED |
08/23/2010 |
0014995 RA |
MAMMINA |
|
NOT APPLICABLE
|
|
INTERIOR ALTERATION INCLUDING, NEW INTERIOR LAYOUT OF ROOMS, NEW CEILINGS
|
|
Work on Floor(s): CEL
|
06/29/2010 |
320180219 |
01 |
A2 |
P APPROVED |
07/02/2010 |
0014995 RA |
MAMMINA |
|
NOT APPLICABLE
|
|
NEW 4"-1" WIDE OPENING FOR PROPOSED EXTERIOR STAIRS AS SHOWN ON DRAWINGS F
|
|
Work on Floor(s): GRO
|
04/19/2005 |
301933317 |
01 |
A3 |
X SIGNED OFF |
12/14/2005 |
0014995 RA |
Mammina |
|
NOT APPLICABLE
|
|
#4400 - Installation of 12' Curb Cut and two 1'-6" spays, 15' Total, locat
|
|
Work on Floor(s): OSP
|
01/20/2005 |
301574883 |
03 |
A2 |
P APPROVED |
01/21/2005 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
01/20/2005 |
301574874 |
03 |
A2 |
P APPROVED |
01/21/2005 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
12/03/2004 |
301749605 |
02 |
A2 |
P APPROVED |
12/08/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
12/03/2004 |
301749598 |
02 |
A2 |
P APPROVED |
12/08/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
11/17/2004 |
301574883 |
02 |
A2 |
P APPROVED |
12/08/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
11/17/2004 |
301574874 |
02 |
A2 |
P APPROVED |
12/08/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 006
|
11/09/2004 |
301483883 |
13 |
NB |
P APPROVED |
12/28/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
11/03/2004 |
301483874 |
12 |
NB |
P APPROVED |
11/04/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
11/01/2004 |
301483883 |
12 |
NB |
G PAA FEE DUE |
11/01/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/19/2004
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
10/21/2004 |
301855179 |
01 |
A2 |
X SIGNED OFF |
03/09/2005 |
0075214 PE |
Donahue |
|
NOT APPLICABLE
|
|
Installation of sprinkler alarm panel with central office connection as pe
|
|
Work on Floor(s): BAS 001 thru 006
|
10/21/2004 |
301855160 |
01 |
A2 |
X SIGNED OFF |
03/09/2005 |
0075214 PE |
Donahue |
|
NOT APPLICABLE
|
|
Installation of sprinkler alarm panel with central office connection as p
|
|
Work on Floor(s): BAS 001 thru 006
|
08/31/2004 |
301483874 |
11 |
NB |
P APPROVED |
10/05/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
05/18/2004 |
301749605 |
01 |
A2 |
X SIGNED OFF |
03/08/2005 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
#4802 - Installation of Sprinkler in Tenant Space in conjunction with NB#
|
|
Work on Floor(s): CEL,001,002
|
05/18/2004 |
301749598 |
01 |
A2 |
X SIGNED OFF |
03/08/2005 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
#4700 - Installation of Sprinklers in Tenant Space in conjunction with NB
|
|
Work on Floor(s): 001
|
05/06/2004 |
301483883 |
11 |
NB |
P APPROVED |
08/25/2004 |
0014995 RA |
Mammina |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
05/06/2004 |
301483874 |
09 |
NB |
P APPROVED |
08/25/2004 |
0014995 RA |
Mammina |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
05/06/2004 |
301483874 |
10 |
NB |
P APPROVED |
08/25/2004 |
0014995 RA |
Mammina |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
05/04/2004 |
301483883 |
10 |
NB |
P APPROVED |
08/25/2004 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
04/23/2004 |
301776932 |
02 |
A2 |
X SIGNED OFF |
02/22/2006 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
#4700 - Subsequent applicant filing for HVAC and Plumbing installations.
|
|
Work on Floor(s): 001
|
04/23/2004 |
301776932 |
01 |
A2 |
X SIGNED OFF |
02/22/2006 |
0014993 RA |
Magnusso |
|
NOT APPLICABLE
|
|
#4700 - Interior renovation of Tenant Spaces in conjunction with NB #30148
|
|
Work on Floor(s): 001
|
04/23/2004 |
301776923 |
02 |
A2 |
X SIGNED OFF |
03/13/2006 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
#4802- Subsequent Applicant filing for Ductwork, HVAC Units and Plumbing
|
04/23/2004 |
301776923 |
01 |
A2 |
X SIGNED OFF |
03/13/2006 |
0014993 RA |
Magnusso |
|
NOT APPLICABLE
|
|
#4802 - Interior renovation of Tenant spaces in conjunction with NB #30148
|
|
Work on Floor(s): CEL,001,002
|
10/31/2003 |
301659140 |
01 |
A2 |
X SIGNED OFF |
04/04/2005 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
BOILER INSTALLATION IN CONJUNCTION WITH NB APPLICATION #301483883. NO C
|
|
Work on Floor(s): CEL
|
10/31/2003 |
301658917 |
01 |
A2 |
X SIGNED OFF |
04/04/2005 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
FILING BOILER IN CONJUNCTION WITH NB APP LICATION #301483874
|
|
Work on Floor(s): CEL
|
10/30/2003 |
301483874 |
08 |
NB |
P APPROVED |
11/19/2003 |
0014995 RA |
Mammina |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
10/14/2003 |
301483883 |
09 |
NB |
P APPROVED |
11/19/2003 |
0046307 PE |
SANCHEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
10/14/2003 |
301483883 |
08 |
NB |
P APPROVED |
11/19/2003 |
0014995 RA |
Mammina |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
10/14/2003 |
301483874 |
07 |
NB |
P APPROVED |
11/19/2003 |
0046307 PE |
Sanchez |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
09/10/2003 |
301483883 |
06 |
NB |
P APPROVED |
09/19/2003 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|