| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/25/2020 |
320100966 |
02 |
A2 |
P APPROVED |
12/01/2020 |
|
JAMIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004 thru 005
|
| 02/07/2020 |
322040741 |
01 |
A2 |
P APPROVED |
03/18/2020 |
0033229 RA |
WALLESTO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/15/2020 RENOVATE EXISTING COMMERCIAL RESTAURANT; GENERAL
|
|
Work on Floor(s): CEL,001
|
| 11/19/2019 |
320754947 |
03 |
A2 |
P APPROVED |
11/22/2019 |
|
JIMENEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 01/28/2019 |
340645608 |
02 |
A2 |
P APPROVED |
02/01/2019 |
|
MESZAROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 006
|
| 01/28/2019 |
321662223 |
02 |
A2 |
P APPROVED |
03/27/2019 |
|
KULIK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 006
|
| 11/09/2018 |
340645608 |
01 |
A2 |
X SIGNED OFF |
02/12/2019 |
0088892 PE |
MESZAROS |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW STAINLESS STEEL CHIMNEY LINER. EXISTING NATURAL GAS TO
|
|
Work on Floor(s): CEL,RF 001 thru 006
|
| 10/02/2017 |
321662223 |
01 |
A2 |
X SIGNED OFF |
04/12/2019 |
0059156 PE |
KULIK |
|
NOT APPLICABLE
|
|
PROPOSE FACADE AND ASSOCIATED STRUCTURAL REPAIRS AS PER PLANS FILED HEREWI
|
|
Work on Floor(s): ROF 001 thru 006
|
| 09/28/2017 |
340547064 |
01 |
A3 |
X SIGNED OFF |
10/24/2018 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF.
|
|
Work on Floor(s): OSP
|
| 08/17/2017 |
340499106 |
02 |
A2 |
P APPROVED |
08/24/2017 |
|
BARNETT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 05/02/2017 |
340499106 |
01 |
A2 |
X SIGNED OFF |
09/19/2017 |
0028397 RA |
BARNETT |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APARTMENT INCLUDING NEW PARTITIONS, FINISHES, FIXTU
|
|
Work on Floor(s): 002
|
| 01/29/2016 |
340281144 |
02 |
A2 |
P APPROVED |
03/04/2016 |
|
BARNETT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 07/14/2015 |
340281144 |
01 |
A2 |
X SIGNED OFF |
04/01/2016 |
0028397 RA |
BARNETT |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT INCLUDING NEW PARTITIONS, FINISHES, FIXTURES AN
|
|
Work on Floor(s): 003
|
| 05/20/2015 |
340261004 |
01 |
A2 |
X SIGNED OFF |
09/25/2015 |
0087737 PE |
SO |
|
NOT APPLICABLE
|
|
REMOVE PLUMBING FIXTURES, REPLACE STOREFRONT WINDOWS, MINOR PARTITION, FLO
|
|
Work on Floor(s): 001
|
| 08/09/2013 |
320754947 |
02 |
A2 |
P APPROVED |
08/21/2013 |
|
KAMEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 06/06/2013 |
320754947 |
01 |
A2 |
X SIGNED OFF |
01/28/2020 |
0022841 RA |
JIMENEZ |
|
NOT APPLICABLE
|
|
CONVERSION OF EXISITING STORE (UG 6)AND DRINKING ESTABLISTMENT (UG 6), NEW
|
|
Work on Floor(s): CEL,001,ROF
|
| 04/19/2013 |
320747634 |
01 |
A2 |
R PERMIT-ENTIRE |
04/26/2013 |
0055633 PE |
MARINO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/29/2013 REPLACE EXISTING 2 COOKING EQUIPMENT AND PROPOSE
|
|
Work on Floor(s): CEL,001
|
| 01/28/2013 |
320712190 |
01 |
A2 |
Q PERMIT-PARTIAL |
03/22/2013 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/29/2013 INSTALL SEVEN AND HALF TON A/C UNIT WITH HEATING
|
|
Work on Floor(s): ROF
|
| 10/31/2012 |
320565633 |
01 |
A2 |
R PERMIT-ENTIRE |
11/08/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/29/2013 REPLACE COUNTER TABLE. REPLACE ALL SEAT TABLES AN
|
|
Work on Floor(s): 001 thru 006
|
| 09/06/2012 |
320580796 |
01 |
A2 |
X SIGNED OFF |
02/10/2014 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
INSTALLATION OF FIRESUPPRESSION SYSTEM AND HOOD/DUCT EXHAUST SYSTEM AS PER
|
|
Work on Floor(s): 001
|
| 08/10/2012 |
320507750 |
01 |
A2 |
X SIGNED OFF |
05/18/2022 |
0034045 RA |
MENZIUSO |
|
NOT APPLICABLE
|
|
MINOR PARTITION WORK IN APT #26, REPLACE AND RELOCATE PLUMBING FIXTURES.NO
|
|
Work on Floor(s): 6TH
|
| 08/03/2012 |
320530859 |
01 |
A2 |
J P/E DISAPPROVED |
10/01/2012 |
0076278 PE |
DYER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/06/2013 APPLICATION BEING FILED TO CONVERT EXISTING COMME
|
|
Work on Floor(s): CEL,001
|
| 05/26/2011 |
320311596 |
01 |
A2 |
X SIGNED OFF |
05/05/2012 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
BOILER AND BURNER REPLACEMENT . EXISTING #2 OIL AND EXISTING NATURAL GAS
|
|
Work on Floor(s): CEL
|
| 11/25/2009 |
320100966 |
01 |
A2 |
X SIGNED OFF |
05/18/2022 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
GUT RENOVATION IN APARTMENTS 22 AND 28,MINOR PARTITIONS AND PLUMBING WORK
|
|
Work on Floor(s): 004 thru 005
|
|
320094713 |
01 |
A2 |
A PRE-FILED |
11/18/2009 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/03/2009 GUT RENOVATION IN APARTMENTS 22 AND 28,MINOR PART
|
|
Work on Floor(s): 004 thru 005
|
| 04/15/2002 |
301330085 |
01 |
A2 |
X SIGNED OFF |
05/18/2002 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
ADDITION OF NATURAL GAS AS AN ALTERNATE FUEL TOTHE EXISTING #2 OIL. NO
|
|
Work on Floor(s): CEL
|