 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/21/2014 |
320402738 |
04 |
A1 |
P APPROVED |
01/28/2014 |
|
MORENA |
|
GRANTED 08/13/2012
|
|
POST APPROVAL AMENDMENT FOR 01 HEREBY FILING TO ADD ONE APARTMENT TO EXIST
|
|
Work on Floor(s): 004,PEN
|
| 11/25/2013 |
320402738 |
03 |
A1 |
P APPROVED |
12/17/2013 |
|
MORENA |
|
GRANTED 08/13/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004,PEN
|
| 08/05/2013 |
320402738 |
02 |
A1 |
P APPROVED |
08/21/2013 |
|
MORENA |
|
GRANTED 08/13/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003
|
| 04/08/2013 |
320742390 |
01 |
A3 |
X SIGNED OFF |
01/23/2014 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 03/07/2013 |
320574623 |
01 |
A3 |
X SIGNED OFF |
02/21/2014 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 3
|
|
Work on Floor(s): OSP
|
| 03/06/2013 |
320574044 |
01 |
A2 |
X SIGNED OFF |
05/23/2014 |
0032500 RA |
MORENA |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR THE WATERPROOFING WORK ON THE FACADE. ALL AS PER PLANS F
|
|
Work on Floor(s): 001,002,003
|
| 09/16/2011 |
320402738 |
01 |
A1 |
X SIGNED OFF |
06/30/2014 |
0032500 RA |
MORENA |
|
GRANTED 08/13/2012
|
|
HEREBY FILING TO ADD ONE APARTMENT TO EXISTING SIX FAMILY BUILIND, CREATIN
|
|
Work on Floor(s): 004,PEN
|
| 01/10/2011 |
320260374 |
01 |
A1 |
X SIGNED OFF |
07/22/2011 |
0032500 RA |
MORENA |
|
NOT APPLICABLE
|
|
UPDATE CERTIFICATE OF OCCUPANCY TO REFLECT THE CURRENT CONDITIONS.NO WORK.
|
|
Work on Floor(s): CEL,001,002,003
|
| 07/13/1993 |
300282682 |
01 |
A2 |
X SIGNED OFF |
07/14/2011 |
0013685 RA |
BLOCH |
|
NOT APPLICABLE
|
|
LEGALIZE INSTALLATION OF GAS BOILER AND GAS HOT WATER HEATER IN CELLAR,
|
|
Work on Floor(s): CEL
|