BIS Menu  |  ECB Violations  |  Applications  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 2
Premises: 161 BROADWAY BROOKLYN BIN: 3063558    Block: 2457    Lot: 28

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
04/18/2025 321145970 06 A1 P APPROVED 05/02/2025 TORRES NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS

02/11/2021 321145970 05 A1 P APPROVED 03/01/2021 TORRES NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS

10/02/2019 321145970 04 A1 P APPROVED 10/09/2019 TORRES NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS

09/26/2019 321182607 02 PA P APPROVED 10/09/2019 TORERES NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

06/25/2019 321145970 03 A1 P APPROVED 09/16/2019 TORRES NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS

06/10/2019 321964683 01 A2 J P/E DISAPPROVED 06/14/2019 0026548 RA TORRES NOT APPLICABLE
 LEGALIZE REMOVAL OF HANDICAP RAMP. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
 Work on Floor(s): OSP

06/03/2019 321961917 01 A2 R PERMIT-ENTIRE 08/20/2019 0026548 RA TORRES NOT APPLICABLE
 LEGALIZE REMOVAL OF HANDICAP RAMP.NO CHANGE IN EGRESS,USE OR OCCUPANCY.THE
 Work on Floor(s): OSP

05/28/2019 321958887 01 A2 R PERMIT-ENTIRE 07/11/2019 0024200 RA PARKER NOT APPLICABLE
 INSTALLATION OF NEW MARQUEE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
 Work on Floor(s): 001 thru 002

07/20/2018 321765666 01 A3 R PERMIT-ENTIRE 08/16/2019 0026548 RA TORRES NOT APPLICABLE
 SIDEWALK REPAIRS AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY
 Work on Floor(s): OSP

05/02/2018 321751724 01 A2 R PERMIT-ENTIRE 11/28/2018 0026548 RA TORRES NOT APPLICABLE
 PROPOSED NEW ENTRANCE CANOPY IN AN EXISTING LANDMARK BUILDING. NO CHANGE I
 Work on Floor(s): 001

04/24/2017 321374231 01 A2 X SIGNED OFF 05/03/2018 0088850 PE LATTERMA NOT APPLICABLE
 HEREWITH FILING APPLICATION FOR RELOCATION OF EXISTING EMERGENCY GENERATOR
 Work on Floor(s): SUB,CEL,ROF 001 thru 003

05/26/2016 321145970 02 A1 P APPROVED 06/27/2016 TORRES NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,BAS

11/16/2015 340326864 01 A3 X SIGNED OFF 02/19/2016 0082770 PE BAILEY NOT APPLICABLE
 PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
 Work on Floor(s): OSP

08/25/2015 321209349 01 A2 X SIGNED OFF 11/10/2016 0044402 PE MASSAND NOT APPLICABLE
 STRUCTURAL WORK IN CELLAR TO PROVIDE REINFORCED SUPPORT FOR VAULT DOOR NO
 Work on Floor(s): CEL

07/31/2015 321182607 01 PA U COMPLETED 05/03/2017 0026548 RA TORERES NOT APPLICABLE
 Work on Floor(s): 001

07/31/2015 321182590 01 PA U COMPLETED 05/03/2017 0026548 RA TORRES NOT APPLICABLE
 Work on Floor(s): BAS

07/31/2015 321182581 01 PA U COMPLETED 05/03/2017 0026548 RA TORRES NOT APPLICABLE
 Work on Floor(s): CEL

06/12/2015 321145970 01 A1 R PERMIT-ENTIRE 04/22/2016 0026548 RA TORRES NOT APPLICABLE
 PROPOSED NEW EATING AND DRINKING ESTABLISHMENT (U.G. 6A)
 Work on Floor(s): CEL,BAS

03/03/2015 321091812 01 A2 R PERMIT-ENTIRE 04/24/2015 0044402 PE MASSAND NOT APPLICABLE
 JOB WITHDRAWN 10/28/2016 PROPOSED SIDEWALK HATCH TO BE CONSTRUCTED BELOW G
 Work on Floor(s): BGS

01/28/2015 321058494 01 A3 X SIGNED OFF 02/26/2015 0017578 RA FORMICHE NOT APPLICABLE
 INSTALLATION OF TEMPORARY TENTS AND PLATFORMS FOR THE EVENT KNOWN AS NIKE
 Work on Floor(s): 001

01/22/2015 320394649 02 PA P APPROVED 01/23/2015 0028697 RA BOSCH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

04/16/2014 320288372 04 A1 P APPROVED 12/09/2014 0028697 RA BOSCH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,BAS 001 thru 004

10/16/2013 320439343 02 A2 P APPROVED 11/04/2013 DONOLLI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 0SC,CEL,BAS 001 thru 004

10/16/2013 320413520 03 A2 P APPROVED 12/04/2013 DONOLLI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

08/20/2013 320288372 03 A1 P APPROVED 08/22/2013 BOSCH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): SUB,CEL,BAS 001 thru 004

08/12/2013 320845216 01 A2 X SIGNED OFF 11/30/2014 0068239 PE DONOLLI NOT APPLICABLE
 INSTALLATION OF 2 BOLIERS.
 Work on Floor(s): SC

04/25/2013 320413539 02 A2 P APPROVED 05/08/2013 DONOLLI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

04/25/2013 320413520 02 A2 P APPROVED 06/06/2013 DONOLLI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

02/14/2013 320714483 01 A3 P APPROVED 04/02/2013 0028697 RA BOSCH NOT APPLICABLE
 FIRE PROTECTION PLAN IN CONJUNCTION WITH APPLICATION #320288372
 Work on Floor(s): SUB,CEL,BAS 001 thru 004

01/17/2013 320701371 01 A2 J P/E DISAPPROVED 09/16/2013 0068239 PE DONOLLI NOT APPLICABLE
 JOB WITHDRAWN 10/09/2013 INSTALLATION OF EMERGENCY GENERATOR AND AIR COOLE
 Work on Floor(s): OSP

01/17/2013 320699482 01 PA U COMPLETED 12/24/2013 0028697 RA BOSCH NOT APPLICABLE
 Work on Floor(s): BAS,CEL

12/07/2012 320413502 02 A2 P APPROVED 01/10/2013 0068239 PE DONOLLI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

08/16/2012 320301268 03 A3 P APPROVED 08/16/2012 0083278 PE HOQUE NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

03/01/2012 320288372 02 A1 P APPROVED 03/01/2013 BOSCH NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 NEW BANQUET HALLS AND N0N-COMMERCIAL ART GA
 Work on Floor(s): SUB,CEL,BAS 001 thru 004

02/24/2012 320439343 01 A2 X SIGNED OFF 05/28/2014 0068239 PE DONOLLI NOT APPLICABLE
 MANUAL/AUTOMATIC/SMOKE/HEAT/DETECTION SPRINKLER ALARM SYSTEM
 Work on Floor(s): 0SC,CEL,BAS 001 thru 004

12/23/2011 320413539 01 A2 X SIGNED OFF 01/08/2014 0068239 PE DONOLLI NOT APPLICABLE
 SPRINKLER/STANDPIPE SYSTEM FILED IN CONJUNCTION WITH CHANGE OF USE APPLICA
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

12/23/2011 320413520 01 A2 X SIGNED OFF 01/08/2014 0068239 PE DONOLLI NOT APPLICABLE
 PLUMBING WORK FILED IN CONJUNCTION WITH CHANGE OF USE APPLICATION 32028837
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

12/23/2011 320413502 01 A2 X SIGNED OFF 10/22/2013 0068239 PE DONOLLI NOT APPLICABLE
 MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH.
 Work on Floor(s): UDG,SUB,CEL 001 thru 004

11/23/2011 320394649 01 PA U COMPLETED 12/24/2013 0028697 RA BOSCH NOT APPLICABLE
 Work on Floor(s): 001

07/18/2011 320301268 02 A3 P APPROVED 07/22/2011 SYED-NAQ NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  ECB Violations  |  Applications  |  Back