 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/25/2022 |
321588448 |
08 |
A1 |
P APPROVED |
03/07/2022 |
|
MEKHTIYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 01/31/2022 |
321588448 |
07 |
A1 |
P APPROVED |
02/17/2022 |
|
MEKHTIYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 10/12/2021 |
321588448 |
06 |
A1 |
P APPROVED |
01/25/2022 |
|
MEKHTIYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 10/04/2021 |
321588448 |
05 |
A1 |
P APPROVED |
10/08/2021 |
|
MEKHTIYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 08/02/2021 |
321588448 |
04 |
A1 |
P APPROVED |
08/17/2021 |
|
MEKHTIYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 09/11/2020 |
321588448 |
03 |
A1 |
P APPROVED |
09/11/2020 |
|
MEKHTIYE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 06/05/2020 |
321588448 |
02 |
A1 |
X SIGNED OFF |
03/16/2022 |
0049244 PE |
LEPTOURG |
|
NOT APPLICABLE
|
|
INSTALL SPREAD FOOTINGS AND ELEVATOR SHAFT FOOTINGS AS PER ATTACHED PLANS.
|
|
Work on Floor(s): 001
|
| 03/11/2020 |
340719976 |
01 |
A2 |
X SIGNED OFF |
07/30/2021 |
0038063 RA |
MEKHTIYE |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR THE REMOVAL OF ALL INTERIOR NON-LOAD BEARING PARTITI
|
|
Work on Floor(s): 001 thru 004
|
| 02/26/2020 |
321588448 |
01 |
A1 |
X SIGNED OFF |
03/16/2022 |
0038063 RA |
MEKHTIYE |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO CONVERT EXIST. MANUFACTURING BUILDING INTO A NON PROF
|
|
Work on Floor(s): CEL,RF 001 thru 004
|
| 02/25/2020 |
340719306 |
01 |
A2 |
H P/E IN PROCESS |
02/25/2020 |
0038063 RA |
MEKHTIYE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/02/2020 APPLICATION FILED FOR INTERIOR DEMOLITION OF ALL
|
|
Work on Floor(s): 001 thru 004
|
| 03/22/2019 |
321481268 |
02 |
A2 |
P APPROVED |
04/08/2019 |
|
PEACHY |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/07/2022
|
|
Work on Floor(s): 001 thru 004
|
| 10/16/2018 |
321481268 |
01 |
A2 |
R PERMIT-ENTIRE |
02/19/2019 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/07/2022 CAP AND REMOVE EXISTING PLUMBING FIXTURES AND GAS
|
|
Work on Floor(s): 001 thru 004
|
| 10/26/2017 |
320066389 |
05 |
A1 |
P APPROVED |
11/02/2017 |
|
PEACHY |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/15/2021 THIS ALTERATION IS FOR THE CONVERSION OF FLOORS 1
|
|
Work on Floor(s): 001 thru 004
|
| 05/03/2017 |
321506571 |
01 |
A2 |
J P/E DISAPPROVED |
05/03/2017 |
0074781 PE |
RENFROE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/16/2021 FILING HEREWITH STRUCTURAL WORK AS PER PLANS FILE
|
|
Work on Floor(s): MZ4,ROF 001 thru 004
|
| 03/16/2017 |
321481277 |
01 |
A2 |
D A/P ENTIRE |
03/16/2017 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/21/2021 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION
|
|
Work on Floor(s): MZ4 001 thru 004
|
| 01/05/2017 |
321481259 |
01 |
A3 |
J P/E DISAPPROVED |
01/05/2017 |
0071249 PE |
GUALTIER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/18/2021 PERFORM EXCAVATION FOR TEST PITS AT FIRST FLOOR.
|
|
Work on Floor(s): 001
|
| 12/12/2016 |
321481240 |
01 |
A2 |
J P/E DISAPPROVED |
12/12/2016 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/28/2021 MODIFICATION OF EXISTING SPRINKLER SYSTEM THROUGH
|
|
Work on Floor(s): ROF,MZ4 001 thru 004
|
| 12/12/2016 |
321091199 |
01 |
A2 |
J P/E DISAPPROVED |
12/12/2016 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/23/2021 INSTALLATION OF PLUMBING AND MECHANICAL THROUGHOU
|
|
Work on Floor(s): ROF,MZ4 001 thru 004
|
| 10/30/2015 |
320066389 |
04 |
A1 |
P APPROVED |
10/02/2017 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/15/2021 N/A
|
|
Work on Floor(s): 001 thru 004
|
| 08/26/2015 |
320066389 |
03 |
A1 |
P APPROVED |
10/23/2015 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/15/2021
|
|
Work on Floor(s): 001 thru 004
|
| 06/06/2011 |
320066389 |
02 |
A1 |
D A/P ENTIRE |
06/29/2011 |
|
WINTER |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 10/15/2021
|
|
Work on Floor(s): 001 thru 004
|
| 10/20/2009 |
320071195 |
01 |
A2 |
J P/E DISAPPROVED |
10/26/2009 |
0033149 RA |
WINTER |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 FILING TO LEGALIZE PLUMBIUNG & MECHANICAL WORK IN
|
|
Work on Floor(s): 001 thru 004
|
| 09/10/2009 |
320066389 |
01 |
A1 |
R PERMIT-ENTIRE |
11/16/2017 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/15/2021 THIS ALTERATION IS FOR THE CONVERSION OF FLOORS 1
|
|
Work on Floor(s): 001 thru 004
|
| 03/06/2003 |
301488076 |
01 |
A2 |
X SIGNED OFF |
09/09/2015 |
0051094 PE |
KATZ |
|
NOT APPLICABLE
|
|
CONVERT EXISTING DRY PIPE SPRINKLER SYSTEM TO WET SPRINKLER SYSTEM. NO CHA
|
|
Work on Floor(s): 001
|
| 12/07/1994 |
300387114 |
02 |
A2 |
P APPROVED |
12/08/1994 |
0021188 RA |
LEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002,003,004
|
| 08/26/1994 |
300387114 |
01 |
A2 |
X SIGNED OFF |
08/02/2000 |
0021188 RA |
LEE |
|
NOT APPLICABLE
|
|
REMOVE CONVEYOR & INSTALL ACCESSORY STAI RS FROM FIRST TO THIRD FLOOR IN
|
|
Work on Floor(s): 001,002,003,004
|