 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 06/27/2017 |
340517890 |
PR |
E LAA FILED |
06/27/2017 |
MP 001974 |
KELLY |
|
REPLACE EXISTING LEAKING CLAY STORM DRAINAGE PIPE WITH APPROXIMATELY 100'
|
|
Work on Floor(s): UDG,CEL
|
| 10/07/2014 |
340194355 |
PR |
E LAA FILED |
10/07/2014 |
MP 001974 |
KELLY |
|
INSTALL ROTARY METER SET AND RUN APPROX. 10' OF 2" AND 90' OF 3" BLACK PIP
|
|
Work on Floor(s): CEL
|
| 05/30/2014 |
320686897 |
PR |
E LAA FILED |
10/02/2014 |
OBI 004219 |
SANTORO |
|
OIL TO DUEL FUEL CONVERSION, REMOVE EXISTING OIL BOILER & INSTALL NEW BURN
|
|
Work on Floor(s): CEL
|