 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/28/2019 |
340658103 |
01 |
A2 |
X SIGNED OFF |
06/11/2019 |
0084288 PE |
CLANCY |
|
NOT APPLICABLE
|
|
INSTALL SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO USE, EGRESS
|
|
Work on Floor(s): CEL,ROF
|
| 09/29/2010 |
320069073 |
03 |
A1 |
G PAA FEE DUE |
09/29/2010 |
|
VON DALW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 07/28/2010 |
320069073 |
02 |
A1 |
P APPROVED |
08/18/2010 |
|
VON DALW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 09/10/2009 |
320069073 |
01 |
A1 |
R PERMIT-ENTIRE |
05/25/2011 |
0033575 RA |
VON DALW |
|
NOT APPLICABLE
|
|
PROPOSED COMBINATION AND INTERIOR RENOVATION OF TOP THREE LEVELS WITHIN AN
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|