 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/29/2020 |
321079989 |
06 |
A1 |
P APPROVED |
11/19/2020 |
|
COLLAQI |
|
GRANTED 08/25/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): R, OSP 001 thru 002
|
| 06/22/2020 |
340738134 |
01 |
A2 |
X SIGNED OFF |
02/09/2021 |
0086722 PE |
CONTRI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTI
|
|
Work on Floor(s): RF
|
| 03/28/2019 |
321079989 |
05 |
A1 |
P APPROVED |
04/02/2020 |
|
COLLAQI |
|
GRANTED 08/25/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): R, OSP 001 thru 002
|
| 02/01/2019 |
340659479 |
01 |
A2 |
R PERMIT-ENTIRE |
08/08/2019 |
0088663 PE |
MEDINA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/03/2021 ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCC
|
|
Work on Floor(s): ROO
|
| 12/13/2018 |
321079989 |
04 |
A1 |
P APPROVED |
03/04/2019 |
0040086 RA |
COLLAQI |
|
GRANTED 08/25/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): R, OSP 001 thru 002
|
| 07/09/2018 |
321079989 |
03 |
A1 |
P APPROVED |
08/29/2018 |
0040086 RA |
COLLAQI |
|
GRANTED 08/25/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): R, OSP 001 thru 002
|
| 04/25/2017 |
321079989 |
02 |
A1 |
P APPROVED |
06/01/2017 |
|
CODY |
|
GRANTED 08/25/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): R, OSP 001 thru 002
|
| 02/17/2015 |
321079989 |
01 |
A1 |
X SIGNED OFF |
06/23/2021 |
0040086 RA |
COLLAQI |
|
GRANTED 08/25/2015
|
|
INTERIOR RENOVATION CONSISTING OF PARTITION WORK, GWB, REPLACE FLOORING,
|
|
Work on Floor(s): R, OSP 001 thru 002
|
| 03/31/2010 |
320138418 |
01 |
A1 |
J P/E DISAPPROVED |
07/19/2012 |
0015312 RA |
CRAWFORD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/24/2020 CONVERT PART EXPERIMENTAL MACHINE SHOP AT 1ST FLO
|
|
Work on Floor(s): 001 thru 002
|