BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z070669
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 884 RIVERSIDE DRIVE MANHATTAN BIN: 1063326     Block: 2136   Lot: 106
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 884 RIVERSIDE DR Census Tract:   247 Health Area:  0500
2C Admin Area:   Z - UPPER MANHATTAN Inspection Area:   B
NEW YORK, NY 10032 Community Board:   112
DOB Cross Street(s):   FORT WASHINGTON AVENUE,    RIVERSIDE DRIVE
Status:   E - ABANDONED 08/22/2025
Request Type:   C - COMPLAINT eFiled:   NO
Application Entered:   06/17/1997 Job Start Date:   12/02/1997
Last Change:   08/22/2025 Job End Date:   12/03/1997
Appointment Status:   
Last Inspection By:   ADMINISTRATION       On     11/05/1999      
Field Disp:   W - ISSUE OBJECTION TO OWNER
Energize Recommendation:  
Objection Disposition:  

License #: 009873 Licensee Name: JOE MIDDLETON
Firm: 001933 Firm Name: NORWAY ELECTRIC CORP.
Firm Phone: 718-992-5500  Firm Address: 1205 JEROME AVENUE BRONX NY 10452 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $10.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: ABRO MGMT CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                       
Total Units : 2 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: V - OBJECTION(S) EXIST
Power Requested: Notice:  10/27/1997
Power Issued: Response: F - FILED TO REMOVE OBJECTION 12/16/1997

Follow-Up: F - FILED TO REMOVE OBJECTION 12/16/1997
Contractor's Comments:  

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: Z070669
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/04/1997 08/07/1997 LHY N (20) (0)
INSPECTION COMMENTS: RING BELL NO RESPONSE KNOCKED ON DOOR NO RESPONSE
 
(2) 08/22/1997 08/27/1997 RID N (30) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(3) 08/26/1997 09/02/1997 LHY W (45) (3)
INSPECTION COMMENTS: *ENTRANCE*& MASTER CORRIDOR *EXPOSED WIRES




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back