BIS Menu  |  ECB Violations  |  Property Profile  |  Applications  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 99 WAVERLY AVENUE BROOKLYN BIN: 3054355    Block: 1889    Lot: 22

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
12/13/2022 340725200 02 A2 P APPROVED 12/15/2022 MEHTA NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 003

04/07/2022 340329843 02 A3 P APPROVED 04/09/2022 PHAGOO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

03/24/2022 340326999 02 A3 P APPROVED 03/24/2022 PHAGOO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

08/18/2020 340757078 01 A2 D A/P ENTIRE 08/18/2020 0102632 PE DESMOND NOT APPLICABLE
 THIS HUB FULL-SERVICE JOB HAS NOT YET BEEN SUBMITTED TO DOB STAFF
 Work on Floor(s): CEL

04/16/2020 340725200 01 A2 X SIGNED OFF 01/20/2023 0024554 RA MEHTA NOT APPLICABLE
 MODERATE REHAB OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR. NEW WIN
 Work on Floor(s): CEL,ROF 001 thru 003

12/20/2019 340711279 01 A2 D A/P ENTIRE 12/20/2019 0024554 RA MEHTA NOT APPLICABLE
 JOB WITHDRAWN 01/31/2020 MODERATE REHAB OF EXISTING CELLAR, FIRST, SECOND
 Work on Floor(s): CEL,ROF 001 thru 003

11/24/2015 340329843 01 A3 X SIGNED OFF 04/12/2022 0089587 PE PHAGOO NOT APPLICABLE
 INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS, THERE WILL BE NO
 Work on Floor(s): OSP

11/15/2015 340326999 01 A3 X SIGNED OFF 03/25/2022 0089587 PE PHAGOO NOT APPLICABLE
 INSTALLATION OF 25'-0" HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. THE
 Work on Floor(s): OSP

05/12/2011 320305870 01 A3 X SIGNED OFF 05/02/2014 0070592 PE STILLER NOT APPLICABLE
 FHA HOUSES GROUP IX - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLAT
 Work on Floor(s): OSP

11/05/2008 310221907 01 A3 X SIGNED OFF 12/02/2011 0072187 PE SYED NOT APPLICABLE
 WE SHALL INSTALL 48 LF OF HEAVY DUTY SIDEWALK SHED, THERE WILL BE NO CHANG
 Work on Floor(s): OSP

01/16/1992 300135565 01 A1 P APPROVED 08/11/1992 0018453 RA WHALEY NOT APPLICABLE
 JOB WITHDRAWN 03/15/2023 NO WORK TO BE DONE.THE WORK WAS DONE UND ER ALT.1
 Work on Floor(s): BST,1ST,2ND,3RD



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  ECB Violations  |  Property Profile  |  Applications  |  Back