| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/10/2010 |
320011027 |
03 |
A2 |
P APPROVED |
10/06/2010 |
|
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,ROF
|
| 03/29/2010 |
320011027 |
02 |
A2 |
P APPROVED |
04/06/2010 |
|
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,ROF
|
| 05/04/2009 |
320011018 |
01 |
A2 |
X SIGNED OFF |
02/24/2011 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
INSTALL NEW SPRINKLER SYSTEM IN CONJUNCTION WITH ALT TYPE I APPLICATION.
|
|
Work on Floor(s): CEL,001,002,003,004
|
| 04/29/2009 |
320011027 |
01 |
A2 |
X SIGNED OFF |
02/24/2011 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
SUBMITTING PLUMBING AND MECHANICAL SYSTEMS IN CONJUNCTION WITH ALT. TYPE I
|
|
Work on Floor(s): CEL,001,002,003,004,ROF
|
| 02/15/2008 |
310091762 |
01 |
A1 |
X SIGNED OFF |
10/28/2011 |
0017305 RA |
Avramide |
|
NOT APPLICABLE
|
|
GUT REHABILITATION OF ENTIRE BUILDING AND OBTAIN A NEW CERTIFICATE OF
|
|
Work on Floor(s): CEL 001 thru 004
|
| 01/05/2006 |
302058555 |
01 |
A2 |
X SIGNED OFF |
05/01/2007 |
0068615 PE |
Botta |
|
NOT APPLICABLE
|
|
Replacement of existing gas fired heating boiler with new gas fired heatin
|
|
Work on Floor(s): CEL
|
| 04/04/2000 |
301014293 |
01 |
A2 |
R PERMIT-ENTIRE |
07/22/2004 |
0063652 PE |
Karantan |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/03/2011 Replace existing wood joist and drywall sheetrock
|
|
Work on Floor(s): 001,002,003,004
|
| 06/17/1999 |
300873053 |
01 |
A2 |
P APPROVED |
06/22/1999 |
0071543 PE |
hall |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/21/2011 RENOVATION OF SEVERAL APPARTMENT ON THE FIRST
|
|
Work on Floor(s): 001,004
|