 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/12/2017 |
321556927 |
01 |
A2 |
R PERMIT-ENTIRE |
05/05/2017 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
INSTALLING NEW FIRE SUPPRESSION SYSTEM. NO OTHER WORK TO BE DONE. NO CHA
|
|
Work on Floor(s): 001
|
| 12/05/2016 |
321316045 |
04 |
A2 |
P APPROVED |
12/06/2016 |
|
PHILOGEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 11/02/2016 |
321316045 |
03 |
A2 |
P APPROVED |
11/03/2016 |
|
PHILOGEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 07/12/2016 |
321316045 |
02 |
A2 |
P APPROVED |
07/19/2016 |
|
PHILOGEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 04/08/2016 |
321366099 |
01 |
A2 |
R PERMIT-ENTIRE |
04/08/2016 |
0031882 RA |
VILLANO |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE BUFFALO AVENUE EXTERIOR FACADE TO REPAIR
|
|
Work on Floor(s): FAC
|
| 03/29/2016 |
340366507 |
01 |
A3 |
R PERMIT-ENTIRE |
03/31/2016 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL
|
|
Work on Floor(s): OSP
|
| 03/14/2016 |
321325320 |
01 |
A2 |
X SIGNED OFF |
04/04/2017 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. IN
|
|
Work on Floor(s): CEL
|
| 02/23/2016 |
321316045 |
01 |
A2 |
X SIGNED OFF |
05/04/2017 |
0062895 PE |
PHILOGEN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING 23 APARTMENTS AS THEY BECOME VACANT.
|
|
Work on Floor(s): 001 thru 004
|
| 12/17/2015 |
340335667 |
01 |
A3 |
R PERMIT-ENTIRE |
12/21/2015 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, E
|
|
Work on Floor(s): OSP
|