 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 09/20/2016 |
340425196 |
PR |
E LAA FILED |
09/20/2016 |
MP 001824 |
MICELI |
|
FILING TO REPLACE EXISTING BATHROOM FIXURES ON THE 1ST AND 2ND FLOORS
|
|
Work on Floor(s): 001,002
|
| 01/06/2011 |
310385482 |
PR |
I LAA SIGNED OFF |
03/09/2011 |
MP 001169 |
BERNARDO |
|
TO REPLACE EXISTING 50 GALLON WATER HEATER IN BASEMENT. INSTALL NEW 50 GAL
|
|
Work on Floor(s): BAS
|
| 11/12/2010 |
310379523 |
PR |
I LAA SIGNED OFF |
12/07/2010 |
MP 000239 |
LEMANSKI |
|
REPIPE APPROX. 8-10FT. OF 4" SOIL STACK LINE & APPROX. 25-30FT. OF 4" DRAI
|
|
Work on Floor(s): CEL
|