| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/20/2018 |
321081262 |
04 |
NB |
P APPROVED |
06/22/2018 |
|
LOMBARDI |
|
GRANTED 02/22/2016
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 04/12/2018 |
321311326 |
02 |
A2 |
P APPROVED |
04/16/2018 |
0026694 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/30/2018 |
321081262 |
03 |
NB |
P APPROVED |
04/11/2018 |
0026694 RA |
LOMBARDI |
|
GRANTED 02/22/2016
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 02/28/2018 |
321796963 |
01 |
SC |
U COMPLETED |
03/19/2018 |
0054776 PE |
SCHNEIDE |
|
NOT APPLICABLE
|
|
ALLOCATION OF CONDOMINIUM LOT NUMBERS TO CONDOMINIUM UNITS
|
| 07/13/2017 |
321081262 |
02 |
NB |
P APPROVED |
07/25/2017 |
|
SCHNEIDE |
|
GRANTED 02/22/2016
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 08/31/2016 |
340374008 |
03 |
A2 |
P APPROVED |
09/02/2016 |
|
GARCIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GND
|
| 07/13/2016 |
340374008 |
02 |
A2 |
P APPROVED |
07/14/2016 |
|
GARCIA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): GND
|
| 06/02/2016 |
321398028 |
01 |
A3 |
X SIGNED OFF |
02/27/2018 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 06/01/2016 |
340387584 |
01 |
A3 |
H P/E IN PROCESS |
06/01/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/01/2016 INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PL
|
|
Work on Floor(s): OSP
|
| 05/03/2016 |
340374008 |
01 |
A2 |
X SIGNED OFF |
03/29/2018 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
EXCAVATION AND SUPPORT OF EXCAVATION IN CONNECTION WITH NEW BUILDING
|
|
Work on Floor(s): GND
|
| 04/04/2016 |
321145658 |
02 |
A2 |
P APPROVED |
07/07/2016 |
|
KATZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 02/22/2016 |
321311326 |
01 |
A2 |
X SIGNED OFF |
07/24/2018 |
0026694 RA |
LOMBARDI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT BUILDING IN CONJUNCTION WITH N
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 02/18/2016 |
340350541 |
01 |
A3 |
X SIGNED OFF |
02/28/2018 |
0035839 RA |
CONNER |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,OCCUPANCY, OR
|
|
Work on Floor(s): OSP
|
| 10/27/2015 |
321264252 |
01 |
A3 |
X SIGNED OFF |
01/26/2018 |
0054776 PE |
SCHNEIDE |
|
NOT APPLICABLE
|
|
BUILDER PAVING PLAN FILED IN CONJUNCTION WITH NB 321081262
|
|
Work on Floor(s): OSP
|
| 08/06/2015 |
321145658 |
01 |
A2 |
X SIGNED OFF |
03/22/2018 |
0051094 PE |
KATZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SMOKE DETECTION ADN SPRINKLER FIRE ALARM SYSTEM.
|
|
Work on Floor(s): CEL,001
|
| 03/04/2015 |
321089362 |
01 |
DM |
X SIGNED OFF |
01/26/2016 |
0071297 PE |
FARUQI |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF EXISTING 2 STORY BUILDING AS PER PLAN.
|
|
Work on Floor(s): 001,002
|
| 02/06/2015 |
321081262 |
01 |
NB |
X SIGNED OFF |
07/26/2018 |
0026694 RA |
LOMBARDI |
|
GRANTED 02/22/2016
|
|
PROPOSED FOUR (4) STORY. FOUR (4) FOUR FAMILY MULTIPLE DWELLING
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 09/22/2014 |
320980346 |
01 |
DM |
E AP-NPE |
09/22/2014 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/25/2015 FILE TO DEMOLISH A TWO STORY FRAME HOUSE
|
|
Work on Floor(s): OSP,ROF,CEL 001 thru 002
|