| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/05/2015 |
320554707 |
04 |
A1 |
P APPROVED |
02/19/2015 |
|
KHOURY |
|
GRANTED 11/20/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 004
|
| 10/31/2013 |
320554707 |
03 |
A1 |
P APPROVED |
11/01/2013 |
|
KHOURY |
|
GRANTED 11/20/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 004
|
| 03/21/2013 |
340047871 |
01 |
A2 |
X SIGNED OFF |
04/10/2015 |
0064508 PE |
KHOURY |
|
NOT APPLICABLE
|
|
FILING MADE FOR APPROVAL OF SPRINKLER WORK ONLY. FILED IN CONJUNCTION WITH
|
|
Work on Floor(s): OSP,ROF 001 thru 004
|
| 03/08/2013 |
340044703 |
01 |
A2 |
H P/E IN PROCESS |
03/08/2013 |
0064508 PE |
KHOURY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/20/2013 FILING MADE FOR APPROVAL OF SPRINKLER WORK ONLY.
|
|
Work on Floor(s): OSP,ROF 001 thru 004
|
| 02/20/2013 |
320554707 |
02 |
A1 |
P APPROVED |
03/28/2013 |
|
KHOURY |
|
GRANTED 11/20/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 004
|
| 11/19/2012 |
320530314 |
04 |
A2 |
P APPROVED |
11/19/2012 |
|
KHOURY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002,OSP,ROF
|
| 11/14/2012 |
320530314 |
03 |
A2 |
P APPROVED |
11/15/2012 |
|
KHOURY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002,OSP,ROF
|
| 10/05/2012 |
320554707 |
01 |
A1 |
X SIGNED OFF |
03/09/2016 |
0064508 PE |
KHOURY |
|
GRANTED 11/20/2012
|
|
CONVERT EXISTING TWO-STORY INDUSTRIAL BUILDING TO A FOUR-STORY, TWO-FAMILY
|
|
Work on Floor(s): OSP,ROF 001 thru 004
|
| 09/21/2012 |
320542258 |
01 |
A3 |
X SIGNED OFF |
08/15/2013 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 09/12/2012 |
320530314 |
02 |
A2 |
P APPROVED |
10/02/2012 |
|
KHOURY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PARTIAL DEMOLITION TO REMOVE STRUCTURAL_DEF
|
|
Work on Floor(s): 001,002,OSP,ROF
|
| 08/03/2012 |
320530314 |
01 |
A2 |
X SIGNED OFF |
05/07/2015 |
0064508 PE |
KHOURY |
|
NOT APPLICABLE
|
|
PARTIAL DEMOLITION TO REMOVE STRUCTURAL_DEFECTIVE
|
|
Work on Floor(s): 001,002,OSP,ROF
|
| 12/11/2007 |
310069458 |
01 |
A2 |
P APPROVED |
01/03/2008 |
0013124 RA |
PALERMO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/15/2015 TO PROVIDE DIRECT REPLACEMENT OF PLUMBING FIXTURE
|
|
Work on Floor(s): 001,002
|
| 08/29/2006 |
302217973 |
01 |
A3 |
X SIGNED OFF |
02/19/2015 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 26 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 11/30/2005 |
302048433 |
01 |
A3 |
X SIGNED OFF |
05/23/2008 |
0013124 RA |
PALERMO |
|
NOT APPLICABLE
|
|
UNDERPIN EXISTING FOUNDATONS AND REPL.ACE 700 S.F. SECTION OF MASONRY WALL
|
|
Work on Floor(s): CEL
|
| 03/07/1994 |
300331157 |
01 |
A2 |
X SIGNED OFF |
01/03/2001 |
0009756 RA |
VELLA |
|
NOT APPLICABLE
|
|
REMOVE EXISTING ELEVATOR EQUIPMENT AND SEAL OPENING WITH STEEL AND
|
|
Work on Floor(s): 1, 2
|