 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/15/2019 |
340692995 |
01 |
A2 |
X SIGNED OFF |
11/07/2019 |
0089728 PE |
AHSAN |
|
NOT APPLICABLE
|
|
INTERIOR EXISTING BATH ROOM RENOVATION AT APARTMENT # D1 (FORTH FLOOR) IN
|
|
Work on Floor(s): 004
|
| 03/10/2017 |
340481259 |
01 |
A2 |
X SIGNED OFF |
10/10/2017 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPAN
|
|
Work on Floor(s): CEL
|
| 02/17/2017 |
321517658 |
01 |
A2 |
P APPROVED |
02/23/2017 |
0038911 RA |
GEISLER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/17/2017 FILING ALT.2 TO INCLUDE DEMOLITION OF INTERIOR,NO
|
|
Work on Floor(s): 002
|
| 10/25/2010 |
320232253 |
01 |
A2 |
X SIGNED OFF |
06/24/2014 |
0028644 RA |
SCOTT |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING APARTMENT. ARCHITECTURAL AND PLUMBING WORK PROPO
|
|
Work on Floor(s): 002
|
| 10/01/2010 |
320221498 |
01 |
SC |
U COMPLETED |
11/04/2010 |
0001961 PE |
HERCZEG |
|
NOT APPLICABLE
|
|
FILING APPLICATION FOR CONDOMINIUM SUBDIVISION.
|
|
Work on Floor(s): CEL,001,002,003,004,ROF
|
| 01/11/2000 |
300984889 |
01 |
A2 |
X SIGNED OFF |
02/08/2000 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER WITH A WEIL MCLAIN LG B10 GAS FIRED STEAM BLR.1200000
|
|
Work on Floor(s): CEL
|