 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/28/2017 |
321012346 |
02 |
A2 |
P APPROVED |
08/22/2018 |
|
MAFFEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,OSP
|
| 08/17/2017 |
340534381 |
01 |
A3 |
R PERMIT-ENTIRE |
08/21/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 08/15/2017 |
340533774 |
01 |
A3 |
R PERMIT-ENTIRE |
08/17/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 07/15/2016 |
321012346 |
01 |
A2 |
X SIGNED OFF |
03/14/2020 |
0016636 RA |
MAFFEI |
|
NOT APPLICABLE
|
|
PROPOSED TO CLEAN & RE POINT BRICK FACADE, CLEAN & REPAINT FIRE ESCAPE/FRO
|
|
Work on Floor(s): CEL,001,OSP
|
| 02/01/2010 |
310169126 |
03 |
A3 |
P APPROVED |
06/04/2010 |
|
FLYNN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/25/2008 |
310169126 |
02 |
A3 |
P APPROVED |
09/17/2008 |
|
FLYNN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/24/2008 |
310169126 |
01 |
A3 |
X SIGNED OFF |
06/11/2010 |
0069956 PE |
FLYNN |
|
NOT APPLICABLE
|
|
PROPOSED SHORING AND UNDERPINNING OF CELLAR AS PER PLAN
|
|
Work on Floor(s): CEL
|
| 10/18/2005 |
302028151 |
01 |
A2 |
X SIGNED OFF |
04/04/2006 |
0078958 PE |
COHEN |
|
NOT APPLICABLE
|
|
EST COST 30,000 REPLACE LOW PRESSURE BOILER & OIL BURNER WITH BOILER & G
|
|
Work on Floor(s): CEL
|
| 09/14/2004 |
301827691 |
01 |
A2 |
X SIGNED OFF |
04/13/2006 |
0016636 RA |
Maffei |
|
NOT APPLICABLE
|
|
Repair existing retaining wall approximately 6'-0" high by 45'-0" long by
|
|
Work on Floor(s): OSP
|
| 09/14/2004 |
301827682 |
01 |
A2 |
X SIGNED OFF |
06/11/2010 |
0016636 RA |
Maffei |
|
NOT APPLICABLE
|
|
Propose to replace damaged underground sewer lines with new. Install prope
|
|
Work on Floor(s): CEL
|