| 11/29/2018 |
340648730 |
01 |
A3 |
X SIGNED OFF |
06/26/2023 |
0072042 PE |
FOSTER |
|
NOT APPLICABLE
|
|
INSTALLATION OF MATERIAL HOIST AS PER PLANS. WORK SHALL COMPLY WITH 2014
|
|
Work on Floor(s): OSP
|
| 11/13/2018 |
340646153 |
01 |
A3 |
P APPROVED |
11/15/2018 |
0072042 PE |
FOSTER |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/05/2023 INSTALLATION OF MATERIAL HOIST AS PER PLANS. WORK
|
|
Work on Floor(s): OSP
|
| 08/06/2012 |
320531652 |
01 |
A3 |
X SIGNED OFF |
08/16/2013 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 08/06/2012 |
320531643 |
01 |
A3 |
X SIGNED OFF |
08/18/2017 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 06/18/2012 |
320495451 |
01 |
A2 |
X SIGNED OFF |
10/30/2013 |
0014548 RA |
DOYLE |
|
NOT APPLICABLE
|
|
REPARI DAMAGES TO EXISTING SANCTUARY FACADE. NO CHANGE TO USE EGRESS OR
|
|
Work on Floor(s): 001
|
| 06/18/2012 |
320495451 |
02 |
A2 |
X SIGNED OFF |
10/30/2013 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
STRUCTURAL PLANS FILED TO INDICATE METHODS OF ANCHORING REPLACEMENT STONE
|
|
Work on Floor(s): 001
|
| 03/12/2012 |
320445577 |
01 |
A3 |
X SIGNED OFF |
07/10/2023 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 250 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDIN
|
|
Work on Floor(s): OSP
|
| 11/10/2011 |
320392534 |
01 |
A3 |
R PERMIT-ENTIRE |
11/10/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/21/2023 INSTALLATION OF PIPE FRAME SCAFFOLD ON ROOF DOME
|
|
Work on Floor(s): OSP
|
| 09/21/2011 |
320363806 |
01 |
A3 |
R PERMIT-ENTIRE |
09/21/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/21/2023 INSTALLATION OF PIPE SCAFFOLD AS PER PLAN AT 271
|
|
Work on Floor(s): OSP
|
| 09/20/2011 |
320104123 |
02 |
A3 |
P APPROVED |
09/21/2011 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/15/2011 |
320402186 |
01 |
A3 |
R PERMIT-ENTIRE |
09/15/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/21/2023 INSTALLATION OF MONORAIL HOIST AS PER PLAN AT 271
|
|
Work on Floor(s): OSP
|
| 08/31/2011 |
320350883 |
01 |
A2 |
X SIGNED OFF |
07/26/2012 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
IT IS PROPOSED TO REPAIR AND REPLACE EXISTING ROOF AS SHOWN ON PLANS. NO
|
|
Work on Floor(s): ROF
|
| 12/02/2009 |
320104132 |
01 |
A3 |
X SIGNED OFF |
07/10/2023 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS. DEBRIS NETTING SHALL COMPL
|
|
Work on Floor(s): ROF
|
| 12/02/2009 |
320104123 |
01 |
A3 |
X SIGNED OFF |
10/20/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 250 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 05/05/2003 |
301531126 |
01 |
A2 |
J P/E DISAPPROVED |
05/06/2003 |
0413691 PE |
SCHNABOL |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/24/2012 INSTALL INDIVIDUALLY CODED INTERIOR FIRE ALARM SYS
|
|
Work on Floor(s): CEL,001,002
|
| 09/16/2002 |
301049522 |
02 |
A2 |
P APPROVED |
11/21/2002 |
0059630 PE |
VELDSHTE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1
|
| 11/28/2001 |
301250919 |
01 |
A2 |
X SIGNED OFF |
03/02/2023 |
0059630 PE |
VELDSHTE |
|
NOT APPLICABLE
|
|
INSTALL 1000 GAL FUEL STORAGE TANK NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): CEL,001
|
| 12/13/2000 |
301049498 |
04 |
A2 |
P APPROVED |
12/15/2000 |
0017736 PE |
SAGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|
| 07/18/2000 |
301049498 |
03 |
A2 |
X SIGNED OFF |
10/04/2005 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PILES, NEW STRUCTURAL FRAMING AND CONCRETE SLAB ON
|
|
Work on Floor(s): 1
|
| 07/18/2000 |
301049498 |
02 |
A2 |
X SIGNED OFF |
10/04/2005 |
0059630 PE |
VELDSHTE |
|
NOT APPLICABLE
|
|
REPLACEMENT OF OIL TANK. REPLACEMENT OF FIXTURES IN EXISTING BATHROOM
|
|
Work on Floor(s): 1
|
| 07/18/2000 |
301049498 |
01 |
A2 |
X SIGNED OFF |
10/04/2005 |
0010078 RA |
KAISERMA |
|
NOT APPLICABLE
|
|
REMOVAL OF INTERIOR NON-BEARING PARTITIO NEW INTERIOR PARTITIONS, REPLAC
|
|
Work on Floor(s): 1
|
| 07/17/2000 |
301049522 |
01 |
A2 |
X SIGNED OFF |
05/05/2023 |
0059630 PE |
VELDSHTE |
|
NOT APPLICABLE
|
|
NEW SPRINKLER SYSTEM AND NEW SPRINKLER SERVICE.NO CHANGE TO USE EGRESS
|
|
Work on Floor(s): CEL,1
|
| 11/24/1997 |
300686461 |
01 |
A3 |
X SIGNED OFF |
06/26/2023 |
0654301 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED 13" OVER EAST END ENTRANCEWAY DURING FACADE REPAIR
|
|
Work on Floor(s): GRD
|
| 08/01/1994 |
300354881 |
01 |
A2 |
J P/E DISAPPROVED |
11/01/1994 |
0010284 RA |
LAWLESS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/21/2012 REPLACE EXISTING METAL RAILINGS AT BLDG. PERIMETE
|
|