BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A369768
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 142-20 FRANKLIN AVENUE QUEENS BIN: 4117051     Block: 5182   Lot: 19
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 142-20 FRANKLIN AV Census Tract:   857 Health Area:  1200
PUBLIC HALL Admin Area:   A - QUEENS Inspection Area:   B
QUEENS, NY 11355 Community Board:   407
DOB Cross Street(s):   UNION STREET,    BOWNE STREET
Status:   C - JOB IS SIGNED OFF 12/13/2018 Balance Paid By Owner
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  11/21/2017 11:58 PM
Application Entered:   11/21/2017 Job Start Date:   11/21/2017
Last Change:   12/13/2018 Job End Date:   09/15/2018
Appointment Status:   
Last Inspection By:   BASDEO, C       On     07/19/2018      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011485 Licensee Name: BENJAMIN DREBIN
Firm: 002950 Firm Name: ACCURATE ELEC'L CORP.
Firm Phone: 718-606-9181  Firm Address: 11-07 43RD ROAD LONG ISLAND CITY NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $93.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MEIR BOUSKILLA
Owner Business Name: FAIRMONT 88 LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001    16        16             
002    16        16             
003    16        16             
004    16        16             
005    16        16             
006    16        16             
007    16        16             
Buildings Total 112        112                
Total Units : 224 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  B1C2I3M4E5N6T- CHANGE PUBLIC HALL LIGHTING ONLY

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: A369768
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/19/2018 07/19/2018 COB C (60) (0) Y
INSPECTION COMMENTS: INSPECTION OK, HALLWAY FIXTURES AND EXITS SIGNS FROM 2ND TO 7TH FLOOR. 1ST FLOOR/LOBBY FILE UNDER SEPARATE APP Q00057711




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back