 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/22/2018 |
340587485 |
01 |
A2 |
R PERMIT-ENTIRE |
05/07/2018 |
0091829 PE |
GARCIA |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATIONS UNIT 6.NO WINDOW WORK
|
|
Work on Floor(s): 2ND
|
| 04/18/2017 |
321559130 |
01 |
A2 |
X SIGNED OFF |
09/21/2017 |
0022382 RA |
TARTAGLI |
|
NOT APPLICABLE
|
|
REPIPE GAS DISTRIBUTION SYSTEM THROUGHOUT BLDG.
|
|
Work on Floor(s): CEL 001 thru 004
|
| 01/10/2012 |
320417447 |
01 |
A2 |
X SIGNED OFF |
12/09/2013 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT (1) NEW COMBINATION OIL/GAS BURNER ON EXISTING BOILER. NEW HIG
|
|
Work on Floor(s): CEL,BOI,RM
|
| 11/17/2008 |
310223068 |
01 |
A2 |
R PERMIT-ENTIRE |
12/11/2008 |
0055633 PE |
MARINO |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATIONS TO APT 9 AT SECOND FLOOR. REPLACE FIXTURES ON
|
|
Work on Floor(s): 002
|
| 02/05/2008 |
310088990 |
01 |
A2 |
X SIGNED OFF |
06/24/2008 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD 20894-01). NO CHANGE IN
|
|
Work on Floor(s): CEL
|