 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/17/2022 |
340869457 |
01 |
A2 |
X SIGNED OFF |
01/27/2023 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
|
|
Work on Floor(s): CEL,ROF
|
| 06/06/2018 |
321744485 |
01 |
A2 |
X SIGNED OFF |
06/21/2018 |
0074729 PE |
MERDJAN |
|
NOT APPLICABLE
|
|
HVAC SYSTEM FILED IN CONJUNCTION WITH #320263834. NO CHANGE TO USE, OCCUPA
|
|
Work on Floor(s): CEL,001,002,003,ROF
|
| 05/21/2018 |
320263834 |
05 |
A1 |
P APPROVED |
06/06/2018 |
0030913 RA |
SAFYAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 003
|
| 06/13/2012 |
320263834 |
04 |
A1 |
P APPROVED |
08/15/2012 |
|
GROBLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 003
|
| 10/06/2011 |
320263834 |
03 |
A1 |
P APPROVED |
10/21/2011 |
|
GROBLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 003
|
| 08/29/2011 |
320263834 |
02 |
A1 |
P APPROVED |
09/06/2011 |
|
GROBLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF,OSP 001 thru 003
|
| 07/19/2011 |
320334893 |
01 |
A2 |
X SIGNED OFF |
05/18/2018 |
0065106 PE |
ONEN |
|
NOT APPLICABLE
|
|
STRUCTUAL WORK FILED IN CONJUNCTION W/APP# 320263834
|
|
Work on Floor(s): OSP
|
| 02/14/2011 |
320263834 |
01 |
A1 |
X SIGNED OFF |
08/20/2018 |
0030913 RA |
SAFYAN |
|
NOT APPLICABLE
|
|
FILING TO CONVERT FROM THREE (3) FAMILY TO A ONE (1) FAMILY DWELLING & FIL
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 003
|