BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 300 7 STREET BROOKLYN BIN: 3021852    Block: 998    Lot: 29

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
02/26/2025 302079042 07 A1 D A/P ENTIRE 06/10/2025 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 003

04/16/2024 302079042 06 A1 P APPROVED 05/28/2024 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 003

04/12/2021 340809548 01 A2 R PERMIT-ENTIRE 02/09/2026 0083410 PE RASHID NOT APPLICABLE
 FILE APPLICATION TO INSTALL NEW WINDOW ON THE 1ST FLOOR LEVEL AT THE REAR
 Work on Floor(s): 001 thru 003

04/22/2019 321944054 01 A2 X SIGNED OFF 10/29/2019 0083410 PE RASHID NOT APPLICABLE
 FILE APPLICATION TO INSTALL TEMPORARY SHORING FOR EXCAVATION TO BUILD A NE
08/28/2015 320902779 01 A2 P APPROVED 09/25/2015 0033041 RA LEE NOT APPLICABLE
 JOB WITHDRAWN 07/09/2025 FILING HEREWITH INTERIOR RENOVATION TO ESTABLISH
 Work on Floor(s): CEL,001

06/01/2015 302079042 05 A1 P APPROVED 08/12/2015 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 003

02/13/2012 320362497 01 A2 X SIGNED OFF 05/22/2012 0073350 PE LEVIN NOT APPLICABLE
 EXTENSION OF EXISTING CHIMNEY, AS REQUIRED. NO CHANGE IN USE, EGRESS OR
 Work on Floor(s): ROF

10/28/2011 302079042 04 A1 P APPROVED 11/22/2011 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 003

11/20/2009 302079042 03 A1 P APPROVED 02/09/2010 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 003

09/21/2009 320002395 01 A2 P APPROVED 09/21/2009 0013798 RA PEACHY NOT APPLICABLE
 JOB WITHDRAWN 12/12/2017 INSTALL BOILERS IN COMMERCIAL UNITS, PERFORM MECH
 Work on Floor(s): CEL 001 thru 003

04/15/2009 320007522 01 A3 X SIGNED OFF 04/11/2017 0013798 RA PEACHY NOT APPLICABLE
 ERECT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
 Work on Floor(s): 001

07/31/2008 302079042 02 A1 P APPROVED 04/09/2009 PEACHY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001 thru 003

03/20/2006 302079042 01 A1 R PERMIT-ENTIRE 09/13/2024 0013798 RA PEACHY NOT APPLICABLE
 Convert building to mixed residential and commercial use. Legalize IMD
 Work on Floor(s): 001 thru 003

03/26/2003 301505976 01 A1 J P/E DISAPPROVED 05/10/2004 0006209 RA SALVATI NOT APPLICABLE
 JOB WITHDRAWN 03/01/2006 TO OBTAIN CERTIFICATE OF OCCUPANCY FOR T HIS REG
 Work on Floor(s): CEL,003

04/02/2001 301150171 01 A2 P APPROVED 04/05/2002 0016524 RA TAN NOT APPLICABLE
 FILING LOFT BOARD ALTERNATE PLANS IN RES PONSE TO ALT 1090 88 PROPOSED N
 Work on Floor(s): 2, 3



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications