 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/24/2015 |
321151677 |
01 |
A2 |
X SIGNED OFF |
03/16/2016 |
0028780 RA |
BLACK |
|
NOT APPLICABLE
|
|
INSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE,
|
|
Work on Floor(s): CEL 001 thru 004
|
| 04/06/2015 |
320501131 |
02 |
A1 |
P APPROVED |
05/06/2015 |
|
BLACK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 06/28/2012 |
320501131 |
01 |
A1 |
X SIGNED OFF |
04/21/2016 |
0028780 RA |
BLACK |
|
NOT APPLICABLE
|
|
CONVERSION OF A ONE DWELLING BUILDING INTO A TWO DWELLING BUILDING, PROPOS
|
|
Work on Floor(s): CEL 001 thru 004
|
| 02/07/2007 |
302190901 |
02 |
A2 |
P APPROVED |
02/09/2007 |
0071729 PE |
UGBEBOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002
|
| 07/13/2006 |
302190901 |
01 |
A2 |
X SIGNED OFF |
05/07/2007 |
0071729 PE |
UGBEBOR |
|
NOT APPLICABLE
|
|
Removal and installation of non load bearing walls and related finishes,
|
|
Work on Floor(s): 001,002
|