 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/30/2015 |
321296076 |
01 |
A2 |
X SIGNED OFF |
07/08/2016 |
0029249 RA |
NICOLAZZ |
|
NOT APPLICABLE
|
|
FILING FOR REPAIRING AND REPLACING WATER PROOFING AT FOUNDATION WALL AS PE
|
|
Work on Floor(s): OSP
|
| 07/25/2008 |
310060475 |
02 |
A2 |
D A/P ENTIRE |
07/28/2008 |
|
Nakrosis |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 003
|
| 11/26/2007 |
310060475 |
01 |
A2 |
R PERMIT-ENTIRE |
05/13/2008 |
0021825 RA |
Nakrosis |
|
NOT APPLICABLE
|
|
Parapet replacement. Install spiral pins at veneer brick. No change to
|
|
Work on Floor(s): ROF 001 thru 003
|
| 06/21/2007 |
302358650 |
01 |
A3 |
R PERMIT-ENTIRE |
01/25/2008 |
OT |
DOWNES |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 90 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 06/21/2007 |
302358641 |
01 |
A3 |
R PERMIT-ENTIRE |
02/01/2008 |
OT |
DOWNES |
|
NOT APPLICABLE
|
|
INSTALLATION OF 90 FEET X 30 FEET HIGH PIPE SCAFFOLD AT THE GARFIELD PLACE
|
|
Work on Floor(s): OSP
|