 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/11/2014 |
340171977 |
01 |
A2 |
X SIGNED OFF |
12/14/2017 |
0069428 PE |
KRIGSMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF GAS PIPING , GAS FIRED BOILER AND GAS FIRED HOT WATER HEAT
|
|
Work on Floor(s): CEL
|
| 10/31/2013 |
320864613 |
01 |
A2 |
R PERMIT-ENTIRE |
12/19/2013 |
0053541 PE |
HAHN |
|
NOT APPLICABLE
|
|
FILING FOR MODIFICATION OF EXISTING KITCHEN RANGEHOOD FIRE SUPPRESSION SYS
|
|
Work on Floor(s): 001
|
| 11/04/2010 |
320235009 |
01 |
A2 |
R PERMIT-ENTIRE |
11/05/2010 |
0083433 PE |
CHANG |
|
NOT APPLICABLE
|
|
HEREWITH FILE TO MINOR REPAIR OF EXIST'G APARTMENT, WORK INCLUDES TO REPLA
|
|
Work on Floor(s): 002
|
| 07/07/2005 |
301958433 |
01 |
A2 |
Q PERMIT-PARTIAL |
07/20/2005 |
0068511 PE |
WASILEWS |
|
NOT APPLICABLE
|
|
APARTMENT RENOVATION, REPLACE EXISTING PLUMBING FIXTURES WITH NEW ON EXIST
|
|
Work on Floor(s): 002
|
| 11/20/1998 |
300813207 |
01 |
A2 |
R PERMIT-ENTIRE |
12/23/1998 |
0066877 PE |
GEORGES |
|
NOT APPLICABLE
|
|
INSTALL THE FIRE SUPPRESSION SYSTEM AS P ER PLAN SUBMITTED. THERE WILL B
|
|
Work on Floor(s): 1
|
| 11/20/1998 |
300813190 |
01 |
A2 |
X SIGNED OFF |
04/27/1999 |
0066877 PE |
GEORGES |
|
NOT APPLICABLE
|
|
REFURBISHING AND CARPENTRY WORK, INSTALL PLUMBING FIXTURES AND GAS EQUIP
|
|
Work on Floor(s): 1, CEL
|