| 06/08/2021 |
321786894 |
03 |
A1 |
P APPROVED |
07/29/2021 |
|
LI |
|
GRANTED 10/23/2018
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 004
|
| 06/26/2019 |
321786894 |
02 |
A1 |
P APPROVED |
08/19/2019 |
|
LI |
|
GRANTED 10/23/2018
|
|
POST APPROVAL AMENDMENT FOR 01 VERTICAL AND HORIZONTAL EXTENSION. OBTAIN N
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 004
|
| 03/05/2019 |
321919180 |
01 |
A2 |
X SIGNED OFF |
05/14/2020 |
0032042 RA |
LI |
|
NOT APPLICABLE
|
|
REMEDY ECB VIOLATION 35381781L. REMOVE AND CAP PLUMBING AND GAS FIXTURES A
|
|
Work on Floor(s): CEL,001,002
|
| 01/04/2019 |
321904374 |
01 |
A2 |
P APPROVED |
03/01/2019 |
0090417 PE |
WANG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/01/2021 TO FILE STRUCTURAL, FOUNDATION AND SOE WORK IN CO
|
|
Work on Floor(s): CEL 001 thru 003
|
| 02/13/2018 |
321786894 |
01 |
A1 |
X SIGNED OFF |
02/18/2022 |
0032042 RA |
LI |
|
GRANTED 10/23/2018
|
|
VERTICAL AND HORIZONTAL EXTENSION. OBTAIN NEW C OF O FOR 4 DWELLING UNITS.
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 004
|