![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B385110 | ||
| NO JOBS FOUND WITH YOUR CRITERIA | ||
| Premises: 926 PRESIDENT STREET BROOKLYN | BIN: 3024810 Block: 1068 Lot: 24 |
| Application Completed and Certified | ||
| Filed: | 926 PRESIDENT ST | Census Tract: 165 | Health Area: 4500 | |
| BASEMENT | Admin Area: B - BROOKLYN | Inspection Area: D | ||
| BROOKLYN, NY 11215 | Community Board: 306 | |||
| DOB Cross Street(s): 8 AVENUE, PROSPECT PARK WEST | |||
| Status: C - JOB IS SIGNED OFF 07/06/2015 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 08/21/2014 5:30 PM | |
| Application Entered: 08/21/2014 | Job Start Date: 08/22/2014 | ||
| Last Change: 07/06/2015 | Job End Date: 08/15/2015 | ||
| Appointment Status: | |||
| Last Inspection By: MOSES, DANIEM On 06/12/2015 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 012355 | Licensee Name: | PETER MILEVSKI | |
| Firm: | 003361 | Firm Name: | ELMAC ELECTRIC INC. | |
| Firm Phone: | 718-894-9727 | Firm Address: | 97-77 QUEENS BLVD TOWER FLOOR REGO PARK NY 11374 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $460.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ARNOLD LEPELSTAT | ||||||
| Authorized Representative: ARNOLD LEPELSTAT | |||||||
| Relationship To Owner: OWNER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 9 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 11 | + New Meters | 9 | - Removed Meters | 11 | = Total Meters | 9 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 08/21/2014 | Notice: | |
| Power Issued: | 08/21/2014 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: REPLACE EXISTING 110 VOLT METERS WITH NEW 3 WIRE METERS. INSTALL RISERS AND PANELS TO THE APARTMENTS AND PICK UP EXISTING LOAD. | |||
|
|
| *NO JOBS FOUND WITH YOUR CRITERIA |