 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/10/2023 |
321357232 |
15 |
A1 |
P APPROVED |
01/30/2023 |
|
CALIENDO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 12/14/2022 |
322071173 |
02 |
A2 |
P APPROVED |
12/15/2022 |
|
GULINO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,CEL
|
| 11/14/2022 |
321357232 |
14 |
A1 |
P APPROVED |
11/16/2022 |
|
CALIENDO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 11/07/2022 |
321357232 |
13 |
A1 |
P APPROVED |
01/20/2023 |
0065574 PE |
SIDERIS |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 10/20/2022 |
321357232 |
12 |
A1 |
P APPROVED |
11/28/2022 |
0097857 PE |
RAFI |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/08/2022 |
321357232 |
11 |
A1 |
P APPROVED |
09/26/2022 |
|
CALIENDO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 09/01/2021 |
321357232 |
10 |
A1 |
P APPROVED |
09/03/2021 |
|
CALIENDO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 004
|
| 03/19/2021 |
321357232 |
09 |
A1 |
P APPROVED |
03/30/2021 |
|
CALIENDO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 03/19/2021 |
340737741 |
02 |
NB |
P APPROVED |
03/30/2021 |
|
CALIENDO |
|
GRANTED 09/18/2020
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/10/2020 |
340628896 |
02 |
A2 |
P APPROVED |
11/10/2021 |
|
RAFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 07/20/2020 |
321357232 |
08 |
A1 |
D A/P ENTIRE |
08/12/2021 |
0065574 PE |
SIDERIS |
|
AMENDED 08/26/2020
|
|
DOC WITHDRAWN 09/17/2021 STRUCTURAL & FOUNDATION WORK FILED SUBSEQUENT TO
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 06/24/2020 |
340737741 |
01 |
NB |
P APPROVED |
09/22/2020 |
0020241 RA |
CALIENDO |
|
GRANTED 09/18/2020
|
|
FILE "NO WORK" NB APPLICATION TO ESTABLISH BUILDING AS NEW BUILDING STATUS
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 03/11/2020 |
321357232 |
07 |
A1 |
P APPROVED |
12/11/2020 |
0097857 PE |
RAFI |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 02 STRUCTURAL AND FOUNDATION WORK FILED SUBSEQ
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 02/28/2020 |
322071173 |
01 |
A2 |
R PERMIT-ENTIRE |
12/24/2020 |
0070916 PE |
GULINO |
|
NOT APPLICABLE
|
|
ASSUMING RESPONSIBILITY FOR SOE UNDER THIS APPLICATION
|
|
Work on Floor(s): OSP,CEL
|
| 08/14/2019 |
321357232 |
06 |
A1 |
D A/P ENTIRE |
01/29/2020 |
0070916 PE |
GULINO |
|
AMENDED 08/26/2020
|
|
DOC WITHDRAWN 08/18/2021
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/13/2019 |
321357232 |
05 |
A1 |
P APPROVED |
08/26/2020 |
|
CALIENDO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 01 _.
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/11/2018 |
340628896 |
01 |
A2 |
X SIGNED OFF |
09/29/2022 |
0097857 PE |
RAFI |
|
NOT APPLICABLE
|
|
PROPOSED PARTIAL DEMOLITION OF 1-STORY BUILDING IN CONJUNCTION WITH ALT-1
|
|
Work on Floor(s): CEL,001,ROF
|
| 04/04/2018 |
321357232 |
04 |
A1 |
P APPROVED |
05/22/2018 |
0070916 PE |
GULINO |
|
AMENDED 08/26/2020
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/13/2016 |
321450069 |
01 |
A3 |
R PERMIT-ENTIRE |
10/06/2016 |
0020241 RA |
CALIENDO |
|
NOT APPLICABLE
|
|
164.5 LIN. FT. SIDEWALK BPP FILED IN CONJUNCTION WITH ALT-1 APPLICATION
|
|
Work on Floor(s): OSP
|
| 08/31/2016 |
321425230 |
01 |
A2 |
R PERMIT-ENTIRE |
01/09/2017 |
0066710 PE |
KEFALAS |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INSTALLATION OF A AUTOMATIC SMOKE/HEAT/CARBON MONOXIDE
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/24/2016 |
340416142 |
01 |
A2 |
P APPROVED |
04/11/2017 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR HYDRAULICALLY DESIGNED SPRINKLER SYSTEM THROUGHOUT BUI
|
|
Work on Floor(s): CEL,OSP,ROF 001 thru 004
|
| 08/11/2016 |
321357232 |
03 |
A1 |
Q PERMIT-PARTIAL |
09/21/2018 |
0065574 PE |
SIDERIS |
|
AMENDED 08/26/2020
|
|
I AM THE SUBSEQUENT APPLICANT FOR THE PL & MH WORK TYPES.
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 06/24/2016 |
321357232 |
02 |
A1 |
R PERMIT-ENTIRE |
09/21/2018 |
0097857 PE |
RAFI |
|
AMENDED 08/26/2020
|
|
STRUCTURAL AND FOUNDATION WORK FILED SUBSEQUENTLY TO ALT 1 JOB #321357232.
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 06/01/2016 |
321357232 |
01 |
A1 |
Q PERMIT-PARTIAL |
11/22/2022 |
0020241 RA |
CALIENDO |
Y |
AMENDED 08/26/2020
|
|
PROPOSED EXTENSION OF EXISTING 1-STORY COMMERCIAL TO BE 4-STORY MIXED USE
|
|
Work on Floor(s): ROF 001 thru 004
|