 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/09/2022 |
340834592 |
01 |
A3 |
R PERMIT-ENTIRE |
03/17/2023 |
0086302 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH NB B00600959.
|
|
Work on Floor(s): OSP
|
| 11/03/2021 |
340827430 |
01 |
A3 |
D A/P ENTIRE |
11/03/2021 |
0086302 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/28/2022 HEREWITH FILING BUILDERS PAVEMENT PLAN IN CONJUNC
|
|
Work on Floor(s): OSP
|
| 08/11/2021 |
322095745 |
01 |
DM |
X SIGNED OFF |
04/13/2022 |
0092183 PE |
PATTERSO |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF TWO STORY STRUCTURE USING HAND HELD AND MECHANICAL TO
|
|
Work on Floor(s): 001 thru 002
|
| 04/25/1991 |
300090318 |
01 |
A2 |
P APPROVED |
02/06/1992 |
0604281 PE |
PRUS |
|
NOT APPLICABLE
|
|
INSTALL NEW DRY CHEM SYSTEM IN RESTAURAN T ON 1ST FLOOR
|
|
Work on Floor(s): 1ST
|