| 07/01/2021 |
322085257 |
03 |
A2 |
P APPROVED |
08/19/2021 |
0032003 RA |
ZYCHOWIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,MEZ,ROF
|
| 05/08/2020 |
322085257 |
02 |
A2 |
P APPROVED |
05/12/2020 |
0084555 PE |
GAYLE |
|
NOT APPLICABLE
|
|
SUPPORTING DOCUMENTATION TO COMPLY WITH NYC ENERGY CODE.
|
|
Work on Floor(s): 001,MEZ,ROF
|
| 05/07/2020 |
322085257 |
01 |
A2 |
P APPROVED |
05/12/2020 |
0032003 RA |
ZYCHOWIC |
|
NOT APPLICABLE
|
|
REPLACE CEILING AND LIGHTING ON FIRST FLOOR AND MEZZANINE LEVEL; REPLACE R
|
|
Work on Floor(s): 001,MEZ,ROF
|
| 04/26/2020 |
340726094 |
01 |
A2 |
H P/E IN PROCESS |
04/26/2020 |
0031041 RA |
GRANT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/10/2020 MODIFICATIONS TO EXISTING FIRST FLOOR AND MEZZANI
|
|
Work on Floor(s): 001,MEZ,ROF
|
| 12/07/2012 |
320692434 |
01 |
PA |
P APPROVED |
12/20/2012 |
0022365 RA |
SHITEMI |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL
|
| 07/23/2012 |
320512352 |
01 |
PA |
P APPROVED |
12/20/2012 |
0022365 RA |
SHITEMI |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001,MEZ
|
| 07/23/2012 |
320512290 |
01 |
A1 |
R PERMIT-ENTIRE |
05/09/2014 |
0022365 RA |
SHITEMI |
|
NOT APPLICABLE
|
|
APPLICATION FILE TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. NO WORK TO BE D
|
|
Work on Floor(s): CEL,1ST,MEZ
|
| 05/23/2012 |
320482651 |
01 |
A3 |
X SIGNED OFF |
08/16/2013 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 05/23/2012 |
320482642 |
01 |
A3 |
X SIGNED OFF |
08/16/2013 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 08/17/2009 |
320062034 |
01 |
A2 |
X SIGNED OFF |
09/24/2009 |
0048918 PE |
LIOTTA |
|
NOT APPLICABLE
|
|
REPLACEMENT OF AIR CONDITONING INSTALLATION.
|
|
Work on Floor(s): ROF
|
| 04/15/2003 |
301533446 |
01 |
A3 |
R PERMIT-ENTIRE |
04/18/2003 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
ERECT SIDEWALK SHED.COMPLY WITH LL 33/91 AND TPPN 9/99
|
|
Work on Floor(s): 001
|
| 11/19/2002 |
300941355 |
05 |
A2 |
P APPROVED |
11/22/2002 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,1, MEZ
|
| 11/19/2002 |
300941355 |
04 |
A2 |
P APPROVED |
11/22/2002 |
0016053 RA |
SEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1, MEZ
|
| 04/19/2001 |
301159500 |
01 |
A3 |
R PERMIT-ENTIRE |
04/08/2003 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
ERECT SIDEWALK SHED. COMPLY WITH LL 31/99 AND TPPN 9/99. NO CHANGE IN USE
|
|
Work on Floor(s): 001
|
| 09/24/1999 |
300941355 |
03 |
A2 |
P APPROVED |
09/24/1999 |
0060943 PE |
SLUTSKY |
|
NOT APPLICABLE
|
|
MECHANICAL WORK IN CONNECTION WITH THE R ENOVATION OF THE BRANCH LIBARY
|
|
Work on Floor(s): CEL,MEZ,1
|
| 09/24/1999 |
300941355 |
02 |
A2 |
P APPROVED |
09/24/1999 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK IN CONNECTION WITH THE R ENOVATION OF THE BRANCH LIBARY
|
|
Work on Floor(s): CEL,1, MEZ
|
| 09/24/1999 |
300941355 |
01 |
A2 |
Q PERMIT-PARTIAL |
08/21/2003 |
0016053 RA |
SEN |
|
NOT APPLICABLE
|
|
RENOVATION OF BRANCH LIBARY TO PROVIDE H ANDICAPPED ACCESSIBLE TOILET.
|
|
Work on Floor(s): CEL,1, MEZ
|
| 10/07/1998 |
300798297 |
01 |
A3 |
R PERMIT-ENTIRE |
10/09/1998 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHED 110' DURING FASADE REPAIR.
|
|
Work on Floor(s): GRD
|