| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/03/2017 |
340528931 |
01 |
A3 |
R PERMIT-ENTIRE |
07/02/2018 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 03/17/2015 |
340240331 |
01 |
A2 |
X SIGNED OFF |
03/11/2016 |
0071073 PE |
SIEGEL |
|
NOT APPLICABLE
|
|
EXTERIOR MASONRY WALL REPAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRES
|
|
Work on Floor(s): BAS 001 thru 006
|
| 06/04/2014 |
340149510 |
01 |
A3 |
R PERMIT-ENTIRE |
06/05/2014 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): GRD
|
| 05/13/2013 |
320541302 |
02 |
A2 |
P APPROVED |
06/12/2013 |
|
SCHIMENT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 11/13/2012 |
320541302 |
01 |
A2 |
R PERMIT-ENTIRE |
04/11/2013 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
PROPOSE TO COMBINE APTS #1A & 1B ON 1ST FLOOR. REPAIR WALLS, FLOORS & CEIL
|
|
Work on Floor(s): CEL,001
|
| 11/05/2012 |
320541295 |
01 |
A2 |
R PERMIT-ENTIRE |
02/26/2013 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
PROPOSE TO COMBINE APTS #2A & 2B ON 2ND FLOOR. REPAIR WALLS, FLOORS & CEIL
|
|
Work on Floor(s): 002
|
| 09/01/2000 |
301077965 |
01 |
A2 |
X SIGNED OFF |
10/12/2000 |
0075316 PE |
SCHNALL |
|
NOT APPLICABLE
|
|
REPLACE BOILER & HW HEATER.NO CHANGE TO EGRESS,OCCUPANCY OR USE
|
|
Work on Floor(s): CEL
|