| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/20/2023 |
320912367 |
14 |
A1 |
P APPROVED |
01/04/2024 |
|
WOELFLIN |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 02/13/2023 |
340619174 |
03 |
A3 |
P APPROVED |
03/01/2023 |
|
DIAZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/16/2022 |
320912367 |
13 |
A1 |
P APPROVED |
04/05/2022 |
|
WOELFLIN |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERT AND ENLARGE EXISTING RESIDENTIAL BU
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 02/08/2022 |
320912367 |
12 |
A1 |
P APPROVED |
02/11/2022 |
0083161 PE |
WAVRO |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 01/07/2022 |
340669976 |
06 |
A2 |
P APPROVED |
02/07/2022 |
|
WAVRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB,OSP 001 thru 010
|
| 12/23/2021 |
340824530 |
02 |
A3 |
P APPROVED |
01/14/2022 |
|
HUQ |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 12/02/2022
|
|
Work on Floor(s): CEL,SUB 001 thru 010
|
| 12/15/2021 |
340811839 |
02 |
A2 |
P APPROVED |
12/16/2021 |
|
STOUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 12/06/2021 |
340669976 |
05 |
A2 |
P APPROVED |
12/23/2021 |
|
WAVRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 11/26/2021 |
320912367 |
11 |
A1 |
P APPROVED |
01/13/2022 |
0083161 PE |
WAVRO |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 11/24/2021 |
320912367 |
10 |
A1 |
P APPROVED |
02/04/2022 |
|
WOELFLIN |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 10/08/2021 |
340824530 |
01 |
A3 |
P APPROVED |
10/13/2021 |
0041157 RA |
HUQ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/02/2022 TENANT PROTECTION PLAN AS PER DRAWINGS.
|
|
Work on Floor(s): CEL,SUB 001 thru 010
|
| 09/30/2021 |
340823906 |
01 |
A3 |
H P/E IN PROCESS |
09/30/2021 |
0041157 RA |
HUQ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/06/2022 TENANT PROTECTION PLAN AS PER DRAWINGS.
|
|
Work on Floor(s): CEL,SUB 001 thru 010
|
| 09/27/2021 |
340619174 |
02 |
A3 |
P APPROVED |
02/24/2022 |
|
DIAZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/30/2021 |
320912367 |
09 |
A1 |
P APPROVED |
10/08/2021 |
|
WOELFLIN |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 01 CONVERT AND ENLARGE EXISTING RESIDENTIAL BU
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 08/13/2021 |
321776039 |
02 |
A2 |
P APPROVED |
08/19/2022 |
|
TROFIMCH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SUB,ROF 001 thru 010
|
| 08/09/2021 |
320912367 |
08 |
A1 |
P APPROVED |
08/17/2021 |
0083161 PE |
WAVRO |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 07/29/2021 |
340669976 |
04 |
A2 |
P APPROVED |
09/01/2021 |
|
WAVRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 07/14/2021 |
321776020 |
02 |
A2 |
P APPROVED |
11/04/2021 |
|
WAVRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DET
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 05/07/2021 |
340811839 |
01 |
A2 |
X SIGNED OFF |
12/29/2021 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRE
|
|
Work on Floor(s): ROF
|
| 10/27/2020 |
340780603 |
01 |
A3 |
X SIGNED OFF |
10/28/2021 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF PERSONNEL/MATERIAL HOIST FOR WORKER SAFETY DURING CONSTRUC
|
|
Work on Floor(s): OSP
|
| 09/09/2020 |
320912367 |
07 |
A1 |
P APPROVED |
09/14/2020 |
0083161 PE |
WAVRO |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 07/07/2020 |
340669976 |
03 |
A2 |
P APPROVED |
07/22/2020 |
|
WAVRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 05/06/2020 |
340703732 |
02 |
A2 |
P APPROVED |
05/13/2020 |
|
HELMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL 001 thru 009
|
| 02/14/2020 |
340717996 |
01 |
A3 |
X SIGNED OFF |
06/10/2021 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF DEBRIS CUTE DURING FOR CONSTRUCTION PURPOSES. DEBRIS CHUTE
|
|
Work on Floor(s): OSP
|
| 02/07/2020 |
322040590 |
01 |
A2 |
X SIGNED OFF |
07/02/2021 |
0067012 PE |
BECKER |
|
NOT APPLICABLE
|
|
TEMPORARY BRACING OF SIDEWALK VAULT FOUNDATION WALLS DURING CONSTRUCTION.
|
|
Work on Floor(s): UDG
|
| 01/07/2020 |
340669976 |
02 |
A2 |
P APPROVED |
01/17/2020 |
|
WAVRO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 11/06/2019 |
340703732 |
01 |
A2 |
X SIGNED OFF |
06/25/2021 |
0087797 PE |
HELMAN |
|
NOT APPLICABLE
|
|
MEANS AND METHODS PLAN FOR PARTIAL DEMOLITION OF 8 STORY MASONRY & STEEL F
|
|
Work on Floor(s): SUB,CEL 001 thru 009
|
| 08/01/2019 |
340690620 |
01 |
A3 |
X SIGNED OFF |
06/10/2021 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF SINGLE 2K TEMPORARY PERSONNEL/MATERIAL HOIST FOR WORKER AC
|
|
Work on Floor(s): OSP
|
| 07/05/2019 |
321976313 |
01 |
SC |
U COMPLETED |
07/11/2019 |
0025988 RA |
WOELFLIN |
|
NOT APPLICABLE
|
|
SUBDIVIDE EXISTING TAX LOT INTO TWO (2) CONDO TAX LOTS. NO CHANGE TO ZONIN
|
| 07/02/2019 |
340680506 |
01 |
A2 |
X SIGNED OFF |
07/09/2021 |
0087797 PE |
HELMAN |
|
NOT APPLICABLE
|
|
REMOVAL OF ENTIRE SPRINKLER SYSTEM PRIOR TO BUILDING DEMO (SEPARATE
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 009
|
| 05/25/2019 |
320912367 |
05 |
A1 |
P APPROVED |
06/12/2019 |
|
WOELFLIN |
|
GRANTED 03/01/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 04/05/2019 |
340670697 |
01 |
A3 |
X SIGNED OFF |
04/25/2022 |
0084781 PE |
O'CONNOR |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF PROTECTION FOR ADJACENT PROPERTY DURING CONSTRUCTION,
|
|
Work on Floor(s): OSP
|
| 04/03/2019 |
340669976 |
01 |
A2 |
X SIGNED OFF |
04/26/2022 |
0083161 PE |
WAVRO |
|
NOT APPLICABLE
|
|
INSTALL COMBINED SPRINKLER/STANDPIPE SYSTEM AS PER PLANS FILED. NO CHANGE
|
|
Work on Floor(s): CEL,ROF,SUB,OSP 001 thru 010
|
| 03/27/2019 |
340665024 |
01 |
A2 |
X SIGNED OFF |
06/25/2021 |
0087797 PE |
HELMAN |
|
NOT APPLICABLE
|
|
REMOVAL OF INTERIOR NON-STRUCTURAL COMPONENTS THROUGHOUT THE BUILDING. NO
|
|
Work on Floor(s): SUB,CEL,001,MEZ 002 thru 009
|
| 03/01/2019 |
320912367 |
04 |
A1 |
X SIGNED OFF |
05/30/2024 |
0089151 PE |
ABISAAB |
|
GRANTED 03/01/2019
|
|
PROVIDE SUPPORT OF EXCAVATION (SOE) AS PER PLANS FILED.
|
|
Work on Floor(s): OSP
|
| 07/16/2018 |
340619174 |
01 |
A3 |
X SIGNED OFF |
11/01/2023 |
0002291 RA |
DIAZ |
|
NOT APPLICABLE
|
|
PROVIDE BUILDERS PAVEMENT PLAN (BPP) FOR A TOTAL FRONTAGE OF 328 FT. AS PE
|
|
Work on Floor(s): OSP
|
| 06/29/2018 |
321776039 |
01 |
A2 |
X SIGNED OFF |
09/25/2023 |
0099830 PE |
TROFIMCH |
|
NOT APPLICABLE
|
|
INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSI
|
|
Work on Floor(s): CEL,SUB,ROF 001 thru 010
|
| 06/29/2018 |
321776020 |
01 |
A2 |
X SIGNED OFF |
06/13/2022 |
0083161 PE |
WAVRO |
|
NOT APPLICABLE
|
|
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 04/25/2018 |
340600415 |
01 |
A2 |
X SIGNED OFF |
03/23/2022 |
0083161 PE |
WAVRO |
|
NOT APPLICABLE
|
|
INSTALL TEMPORARY DRY STANDPIPE DURING CONSTRUCTION AS PER PLANS FILED. NO
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|
| 04/04/2018 |
320912367 |
03 |
A1 |
X SIGNED OFF |
05/30/2024 |
0083161 PE |
WAVRO |
|
GRANTED 03/01/2019
|
|
MECHANICAL AND PLUMBING WORK AS PER PLANS FILED.
|
|
Work on Floor(s): CEL,ROF,SUB 001 thru 010
|