 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/19/2015 |
302578333 |
01 |
A2 |
X SIGNED OFF |
10/11/2018 |
0091224 PE |
MOHAMED |
|
NOT APPLICABLE
|
|
K802 - FILED HEREWITH ENERGY ANALYSIS ASSOCIATED WITH REPLACEMENT OF EXIST
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 05/09/2008 |
310135190 |
01 |
A3 |
P APPROVED |
06/11/2008 |
0056767 PE |
NAZRUL |
|
NOT APPLICABLE
|
|
TO INSTALL PIPE SCAFFOLD 96'-0''(+/-) LONG AND 80'-0''(+/-) HIGH ON GRADE
|
|
Work on Floor(s): 001 thru 007
|
| 11/02/2007 |
302114860 |
01 |
A3 |
X SIGNED OFF |
10/15/2009 |
0072167 PE |
SYED |
|
NOT APPLICABLE
|
|
CENTRAL HEADQUARTERS FENCE IN CONJUNCTION W/302107850
|
|
Work on Floor(s): OSP
|
| 11/02/2007 |
302114851 |
01 |
A3 |
X SIGNED OFF |
05/15/2009 |
0072187 PE |
SYED |
|
NOT APPLICABLE
|
|
CENTRAL HEADQUARTERS SIDEWALK SHED @ 302107850
|
|
Work on Floor(s): OSP
|
| 11/02/2007 |
302114842 |
01 |
A3 |
X SIGNED OFF |
05/15/2009 |
0072187 PE |
SYED |
|
NOT APPLICABLE
|
|
CENTRAL HEADQUARTERS SCAFFOLD 302107850
|
|
Work on Floor(s): OSP
|
| 05/22/2007 |
302107850 |
01 |
A2 |
X SIGNED OFF |
12/02/2010 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
DOE CENTRAL HEADQUARTERS FILING FOR PARAPETS, ROOFS, EXTERIOR MASONRY, W
|
|
Work on Floor(s): ROF 001 thru 006
|
| 06/16/2005 |
301963962 |
01 |
A3 |
R PERMIT-ENTIRE |
06/22/2005 |
OT |
sing |
|
NOT APPLICABLE
|
|
WE SHALL INSTALL 50 LINEAR FT OF HEAVY DUTY SIDEWALK SHED. THIS SHALL NOT
|
|
Work on Floor(s): 001
|
| 06/21/2002 |
300893870 |
02 |
A2 |
P APPROVED |
06/21/2002 |
0046016 PE |
CASTELLA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 06/05/2001 |
301177624 |
01 |
A3 |
R PERMIT-ENTIRE |
06/14/2001 |
0065430 PE |
Hickey |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD 15' LONG X 60' HIGH DURING FACADE REPAIR CHI
|
|
Work on Floor(s): 001
|
| 12/11/2000 |
301107521 |
01 |
A3 |
R PERMIT-ENTIRE |
12/14/2000 |
0654301 PE |
Hickey |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 34' DURING FACADE REPAIR.
|
|
Work on Floor(s): 001
|
| 10/24/2000 |
300970509 |
01 |
A3 |
X SIGNED OFF |
04/22/2005 |
|
STACOM |
|
NOT APPLICABLE
|
|
BOE CTR HEADQUARTERS FENCE FOR A BOILER CONVERSION
|
|
Work on Floor(s): OSP
|
| 05/03/2000 |
300893870 |
01 |
A2 |
X SIGNED OFF |
04/22/2005 |
0046016 PE |
CASTELLA |
|
NOT APPLICABLE
|
|
PS802 BOILER CONVERSION CLIMATE CONTROL RENOVATION
|
|
Work on Floor(s): BAS
|
| 10/01/1999 |
300944450 |
01 |
A3 |
R PERMIT-ENTIRE |
10/05/1999 |
0654301 PE |
Hickey |
|
NOT APPLICABLE
|
|
Installation of a heavy duty scaffold 65' x 85' high.
|
|
Work on Floor(s): 1, 6
|
| 09/09/1999 |
300936502 |
01 |
A3 |
R PERMIT-ENTIRE |
09/10/1999 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SHED 140' DURING FACADE REPAIR. NO CHANGE
|
|
Work on Floor(s): GRD
|
| 07/15/1997 |
300760139 |
01 |
A2 |
R PERMIT-ENTIRE |
07/15/1997 |
0579851 PE |
MALTZ |
|
NOT APPLICABLE
|
|
CENTRAL HEADQUARTERS K INSTALLATION OF SMOKE DETECTION SYSTEM FOR ELEVA
|
|
Work on Floor(s): 001 thru 006
|
| 01/25/1996 |
300497193 |
01 |
A3 |
R PERMIT-ENTIRE |
05/21/1997 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLDING 64' HIGH BY 50' LOND DURING FACADE REPAIR
|
|
Work on Floor(s): GRD
|
| 07/19/1995 |
300458145 |
01 |
A2 |
P APPROVED |
07/24/1995 |
0051239 PE |
WEINSTEI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/28/2002 ABANDON W/CONCRETE SLURRY (2) 550 GALLON UNDERGR
|
|
Work on Floor(s): GRD
|
| 04/19/1995 |
300431147 |
01 |
A3 |
R PERMIT-ENTIRE |
02/09/1996 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
INSTALL 70'-0" OF HEAVY DUTY SHED FOR FA CADE REPAIR NO CHANGE IN USE EG
|
|
Work on Floor(s): GRD
|