| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/10/2018 |
340576291 |
01 |
A2 |
X SIGNED OFF |
04/23/2019 |
0088892 PE |
MESZAROS |
|
NOT APPLICABLE
|
|
REPLACEMENT OF GAS RISER FOR E LINE. NO CHANGE IN EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): PH 001 thru 007
|
| 12/12/2017 |
340569003 |
01 |
A2 |
X SIGNED OFF |
03/28/2018 |
0031951 RA |
MAN |
|
NOT APPLICABLE
|
|
MINOR CONSTRUCTION WORK IN APT. 3K TO REMOVE A BEDROOM. REMOVAL OF
|
| 12/01/2017 |
321692405 |
01 |
A2 |
H P/E IN PROCESS |
12/04/2017 |
0031951 RA |
MAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/19/2017 MINOR CONSTRUCTION WORK IN APT. 3K TO REMOVE A BE
|
|
Work on Floor(s): 003
|
| 11/15/2017 |
321685878 |
02 |
A2 |
R PERMIT-ENTIRE |
11/17/2017 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
HVAC MODIFICATIONS AT ROOF AND ROOF BULKHEAD WITH RELATED WORK AS PER PLAN
|
|
Work on Floor(s): ROF
|
| 11/15/2017 |
321685878 |
01 |
A2 |
R PERMIT-ENTIRE |
11/28/2017 |
0036847 RA |
SCHENK |
|
NOT APPLICABLE
|
|
ARCHITECTURAL MODIFICATIONS AT ROOF AND ROOF BULKHEAD WITH RELATED WORK AS
|
|
Work on Floor(s): ROF
|
| 10/20/2017 |
321262682 |
04 |
A2 |
P APPROVED |
10/25/2017 |
|
BERGMANN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 08/01/2017 |
321262682 |
03 |
A2 |
P APPROVED |
08/23/2017 |
|
BERGMANN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 11/15/2016 |
321480394 |
01 |
A2 |
X SIGNED OFF |
10/16/2018 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 8TH FLOOR AND ROOF A
|
|
Work on Floor(s): 008,ROF
|
|
321478600 |
01 |
A2 |
A PRE-FILED |
11/10/2016 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
MODIFICATION TO THE EXISTING FIRE ALARM SYSTEM ON THE 8TH FLOOR AND ROOF A
|
|
Work on Floor(s): 008,ROF
|
| 10/05/2016 |
321460682 |
01 |
A2 |
X SIGNED OFF |
07/02/2019 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
MINOR MECHANICAL, SPRINKLER, AND STANDPIPE CHANGES TO 8TH FLOOR DUPLEX
|
|
Work on Floor(s): 008,ROF
|
| 12/17/2015 |
321262682 |
02 |
A2 |
P APPROVED |
12/28/2015 |
|
BERGMANN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 008
|
| 10/26/2015 |
321262682 |
01 |
A2 |
X SIGNED OFF |
02/08/2019 |
0034496 RA |
BERGMANN |
|
NOT APPLICABLE
|
|
INTERIOR ARCHITECTURAL AND PLUMBING CHANGES TO 8TH FLOOR DUPLEX APARTMENT,
|
|
Work on Floor(s): 008
|
| 01/17/2013 |
320107923 |
13 |
NB |
P APPROVED |
02/08/2013 |
|
MAQAMI |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,8MZ 001 thru 008
|
| 10/09/2012 |
320152945 |
02 |
A3 |
P APPROVED |
10/15/2012 |
|
MALEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 BNP 10-099,TOTAL FRONTAGE 205',NB# 32010792
|
|
Work on Floor(s): OSP
|
| 08/31/2012 |
320522458 |
01 |
A2 |
X SIGNED OFF |
01/10/2013 |
0030764 RA |
TINMOUTH |
|
NOT APPLICABLE
|
|
MINOR CONSTRUCTION WORK IN APT. 4K TO REMOVE A BEDROOM. WORK TO INCLUDE
|
|
Work on Floor(s): 004
|
| 04/09/2012 |
320107923 |
12 |
NB |
P APPROVED |
04/11/2012 |
|
MAQAMI |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,8MZ 001 thru 008
|
| 03/27/2012 |
320187089 |
02 |
A3 |
P APPROVED |
03/27/2012 |
|
MALEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/27/2012 |
320187070 |
02 |
A3 |
P APPROVED |
03/27/2012 |
|
MALEK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/20/2012 |
320107923 |
11 |
NB |
P APPROVED |
03/21/2012 |
|
MAQAMI |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,8MZ 001 thru 008
|
| 03/19/2012 |
320450533 |
01 |
SC |
U COMPLETED |
04/16/2012 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
CONDOMINIUM SUBDIVISION AS SHOWN ON DRAWINGS FILED HEREWITH.
|
|
Work on Floor(s): CEL,8MZ 001 thru 008
|
| 03/12/2012 |
320187150 |
02 |
A2 |
P APPROVED |
03/28/2012 |
|
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,MZ8 001 thru 008
|
| 03/12/2012 |
320107923 |
10 |
NB |
P APPROVED |
03/14/2012 |
0602931 PE |
ETTINGER |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 009
|
| 02/15/2012 |
320430681 |
01 |
A3 |
P APPROVED |
03/29/2012 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
FILING FIRE PROTECTION PLAN IN CONJUNCTION WITH NB #320107923 AS SHOWN ON
|
|
Work on Floor(s): CEL,8MZ,ROF 001 thru 008
|
| 02/03/2012 |
320107923 |
09 |
NB |
D A/P ENTIRE |
02/10/2012 |
0602931 PE |
ETTINGER |
|
GRANTED 10/22/2010
|
|
DOC WITHDRAWN 02/24/2012
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 009
|
| 01/26/2012 |
320107923 |
08 |
NB |
P APPROVED |
01/31/2012 |
|
MAQAMI |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,8MZ 001 thru 008
|
| 12/14/2011 |
320346185 |
02 |
A2 |
P APPROVED |
12/19/2011 |
|
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/12/2011 |
320346185 |
01 |
A2 |
X SIGNED OFF |
09/08/2012 |
0602931 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
FILING TO INSTALL BOILER AS PER DRAWINGS AS SHOWN ON DRAWINGS FILED HEREWI
|
|
Work on Floor(s): CEL
|
| 06/16/2011 |
320251106 |
02 |
A3 |
P APPROVED |
06/16/2011 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 108 LINEAR FEET OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 06/01/2011 |
320107923 |
07 |
NB |
P APPROVED |
01/24/2012 |
0022311 RA |
MAQAMI |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,8MZ 001 thru 008
|
| 05/26/2011 |
320107923 |
06 |
NB |
P APPROVED |
06/07/2011 |
0602931 PE |
ETTINGER |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 009
|
| 03/28/2011 |
320261701 |
02 |
A3 |
P APPROVED |
03/29/2011 |
|
MC ERLEA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/03/2011 |
320107923 |
05 |
NB |
P APPROVED |
05/10/2011 |
|
MAQAMI |
|
GRANTED 10/22/2010
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF,MZ8 001 thru 008
|
| 02/02/2011 |
320268303 |
01 |
A2 |
X SIGNED OFF |
09/04/2012 |
0602931 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR UNDERGROUND PLUMBING IN CONJUNCTION WITH NB# 320107923
|
|
Work on Floor(s): UDG
|
| 01/26/2011 |
320263530 |
01 |
A2 |
X SIGNED OFF |
09/04/2012 |
0602931 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY STANDPIPE ALARM SYSTEM, IN CONJUNCTION WITH NEW
|
|
Work on Floor(s): CEL,BAS 001 thru 009
|
| 01/19/2011 |
320261701 |
01 |
A3 |
X SIGNED OFF |
02/11/2012 |
0079601 PE |
MC ERLEA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SINGLE 6000 STROS PERSONEL/MATERIAL HOIST AT THE SOUTH
|
|
Work on Floor(s): OSP
|
| 01/19/2011 |
320261694 |
01 |
A3 |
X SIGNED OFF |
06/26/2012 |
0079601 PE |
MC ERLEA |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SINGLE 6000 STROS PERSONEL/MATERIAL HOIST AT THE NORTH
|
|
Work on Floor(s): OSP
|
| 12/10/2010 |
320251106 |
01 |
A3 |
X SIGNED OFF |
02/11/2012 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 108 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDI
|
|
Work on Floor(s): OSP
|
| 09/24/2010 |
320107923 |
04 |
NB |
X SIGNED OFF |
02/13/2013 |
0068605 PE |
PILLORI |
|
GRANTED 10/22/2010
|
|
FILING SUPPORT OF EXCAVATION DRAWINGS.
|
|
Work on Floor(s): CEL,ROF 001 thru 008
|
| 07/12/2010 |
320187089 |
01 |
A3 |
X SIGNED OFF |
08/13/2012 |
0077251 PE |
MALEK |
|
NOT APPLICABLE
|
|
FILING TO INSTALL NEW 22.2 FT. CURB CUT AS PER DRAWINGS. THIS IS BEING FI
|
|
Work on Floor(s): OSP
|
| 07/12/2010 |
320187169 |
01 |
A2 |
X SIGNED OFF |
08/21/2012 |
0602931 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
FILING TO INSTALL NEW AUTOMATIC SMOKE/HEAT DETECTION SPRINKLER ALARM SYSTE
|
|
Work on Floor(s): CEL,ROF 001 thru 008
|