BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
 
Page: 1 of 1
Premises: 2 MT HOPE PLACE BRONX BIN: 2129187    Block: 2851    Lot: 7501

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
11/17/2023 220601695 20 NB P APPROVED 12/15/2023 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

03/09/2023 220601695 19 NB P APPROVED 03/13/2023 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

01/09/2023 220601695 18 NB P APPROVED 01/18/2023 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

12/23/2022 220601695 17 NB P APPROVED 01/04/2023 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

12/06/2022 220601695 16 NB P APPROVED 12/13/2022 0044086 PE POLATSEK GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

10/28/2022 220601695 15 NB P APPROVED 12/12/2022 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

09/22/2022 220601695 14 NB D A/P ENTIRE 11/02/2022 0044086 PE POLATSEK GRANTED 01/23/2019
 DOC WITHDRAWN 11/30/2022
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

08/12/2022 220747501 01 SC U COMPLETED 09/13/2022 0043989 RA PIA NOT APPLICABLE
 HEREBY FILING FOR CONDOMINIUM SUBDIVISION IN CONJUNCTION WITH NB APPLICATI
03/23/2022 220601695 13 NB P APPROVED 07/18/2022 0044086 PE POLATSEK GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 03
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

02/11/2022 220601695 12 NB P APPROVED 09/15/2022 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

07/29/2021 220620264 04 A3 P APPROVED 08/05/2021 CALIENDO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

06/18/2021 220620264 03 A3 P APPROVED 06/30/2021 CALIENDO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

09/01/2020 220601695 11 NB P APPROVED 10/14/2020 CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

01/22/2020 220601695 10 NB P APPROVED 01/23/2020 0082064 PE DJOHAN GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 05
 Work on Floor(s): OSP,CEL,MEZ,001

01/22/2020 220601695 09 NB P APPROVED 01/23/2020 0082064 PE DJOHAN GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 02
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

08/20/2019 220601695 08 NB P APPROVED 12/16/2019 0020241 RA CALIENDO GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 01 FILING FOR MANDATORY INCLUSIONARY HOUSING (
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

06/26/2019 220601695 07 NB P APPROVED 08/26/2019 0082064 PE DJOHAN GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 04 FILING FOR A MANDATORY INCLUSIONARY HOUSING
 Work on Floor(s): OSP,CEL,MEZ,001

06/26/2019 220601695 06 NB P APPROVED 12/05/2019 0082064 PE DJOHAN GRANTED 01/23/2019
 POST APPROVAL AMENDMENT FOR 05 FILING FOR A MANDATORY INCLUSIONARY HOUSING
 Work on Floor(s): OSP,CEL,MEZ,001

01/14/2019 220601695 05 NB X SIGNED OFF 08/15/2024 0082064 PE DJOHAN GRANTED 01/23/2019
 FILING FOR A MANDATORY INCLUSIONARY HOUSING (11) ELEVEN STORY MIX-USE BUIL
 Work on Floor(s): OSP,CEL,MEZ,001

01/14/2019 220601695 04 NB X SIGNED OFF 08/15/2024 0082064 PE DJOHAN GRANTED 01/23/2019
 FILING FOR A MANDATORY INCLUSIONARY HOUSING (11) ELEVEN STORY MIX-USE BUIL
 Work on Floor(s): OSP,CEL,MEZ,001

09/04/2018 220620264 02 A3 P APPROVED 10/15/2018 CALIENDO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

02/08/2018 220601695 03 NB X SIGNED OFF 08/15/2024 0044086 PE POLATSEK GRANTED 01/23/2019
 HERE WITH FILING DRAWINGS FOR BOILER, MECHANICAL, PLUMBING, STANDPIPE AND
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

01/30/2018 220601695 02 NB X SIGNED OFF 08/15/2024 0082064 PE DJOHAN GRANTED 01/23/2019
 HERE WITH FILING STRUCTURAL DRAWINGS AS A SUBSEQUENT FILING WITH NB #22060
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011

10/11/2017 220620264 01 A3 X SIGNED OFF 04/11/2023 0020241 RA CALIENDO NOT APPLICABLE
 346.55 LIN. FEET BPP FILED IN CONJUNCTION WITH NB 220601695
 Work on Floor(s): OSP

06/22/2017 220601695 01 NB X SIGNED OFF 08/15/2024 0020241 RA CALIENDO GRANTED 01/23/2019
 FILING FOR MANDATORY INCLUSIONARY HOUSING (11) ELEVEN STORY MIX-USE BUILDI
 Work on Floor(s): CEL,ROF,MEZ,OSP 001 thru 011



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications